Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

McLoud Run East Floodwall Construction
Infrastructure
Results
$1,504,558 est. value
Cedar Rapids, IA 52402

8th Street Southwest Between 21st Avenue and 22nd Avenue Drainage Improvements
Infrastructure
Results
$20,000 est. value
Cedar Rapids, IA

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

NCSML Floodwall and 16th Avenue SW Road Gate
Infrastructure
Results
$7,900,000 est. value
Cedar Rapids, IA 52404

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

Cedar Lake North Shore and Levee
Infrastructure
Results
$20,840,000 est. value
Cedar Rapids, IA 52497

Sunland Drive South East South of Cottage Grove Avenue Flood Protection
Conception
$765,000 est. value
Cedar Rapids, IA 52403

Aluminum Box Culvert Stream Crossing
Infrastructure
Results
Central City, IA 52214

USACE South Railyard Floodwall CC
Conception
Cedar Rapids, IA

Pioneer Avenue SouthEast at Oakridge Drive Drainage Improvements
Infrastructure
Results
$110,000 est. value
Cedar Rapids, IA 52403

USACE R1 N Railyard Levee CC
Conception
Cedar Rapids, IA

Last Updated 05/23/2022 02:43 AM
Project Title

Cedar Rapids Flood Risk Management Project

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to: access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; and landscaping. McLoud Run Lower Reach Channel (BASE): The work includes, but is not limited to: demolition; temporary traffic control; clearing, grubbing and stripping; temporary diversion of water; channel excavation, filling, and grading; riprap and bedding stone placement; trail construction; site restoration; and landscaping. McLoud Run Lower Reach Culverts (OPTION A): The work includes, but is not limited to: access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; and landscaping. McLoud Run Lower Reach Levee (OPTION B): The work includes, but is not limited to: site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; and landscaping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Riprap.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Levees, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents