Similar Projects
Challenger School
New Construction
Conception
Leander, TX 78641

CMAR CD Fulkes Middle School Rebuild
Renovation
Post-Bid
Less than $50,000,000 est. value
Round Rock, TX

Tippit Middle School Athletic Wing Addition and Renovations
Renovation, Addition
Post-Bid
Less than $4,500,000 est. value
Georgetown, TX 78628

Job Order Contract for General Construction
Term Contract
Results
Round Rock, TX

Job Order Contract for General Construction
Term Contract
Results
Round Rock, TX

Construction Manager at Risk - CMAR for McNeil High School Master Plan Phase 2A
Renovation, Addition - 140,200 SF
Construction
Less than $39,000,000 est. value
Round Rock, TX 78729

East View High School Classroom Renovations
Renovation
Construction
Less than $1,500,000 est. value
Georgetown, TX 78628

Florence ISD - Multi-Campus Renovations
Renovation
Post-Bid
Less than $6,000,000 est. value
Florence, TX 76527

Construction Manager at Risk (CMAR) for Elementary School 35
New Construction
Results
$38,000,000 est. value
Round Rock, TX 78681

Safe and Secured Vestibules
Construction
Leander, TX 78646

Caraway Elementary School Expansion Renovations
Renovation
Post-Bid
Round Rock, TX 78681

Multi-Campus Renovation Project 2
Renovation
Results
$11,000,000 est. value
Round Rock, TX 78665

Wellspring Preparatory Academy
New Construction
Construction
Georgetown, TX 78626

Florence ISD – Package 2
Post-Bid
Florence, TX 76527

2019 Building Program
Renovation, Addition
Results
Leander, TX 78641

Last Updated 01/02/2020 08:23 AM
Project Title

Construction Manager at Risk Various Projects

Physical Address View project details and contacts
City, State (County) Hutto, TX 78634   (Williamson County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $103,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project A: Transportation Facility The Project will have a building footprint of 12,375 square foot (9) 30' bays x 55 deep. The Project will include a Pre-Engineered Metal Building Construction on slab on grade. 5 Bays would be unconditioned pull through maintenance bays. The other 4 would be two story. Level 1 of the conditioned space is 5,500 square feet with lockers, toilets, office and reception, break room, shop, and storage. Level 2 of the conditioned space is 5,500 square feet with 3,800 sf professional development room, 400 square foot warming kitchen and 1,000 square foot dispatch office. Package DX HVAC system in conditioned space, heaters and vents in unconditioned space. Site work to include 150 bus parking spaces and associated drives, 230 additional auto parking spaces, detention pond, utilities, parking lot lighting and security, perimeter chain link fencing. The District currently anticipates that another 800 square feet in additional construction as a Technology Center is incorporated into the Project.The estimated construction cost is $4,750,000.00. Project B: HES Facility Hutto Elementary School Additions and Renovations Project (located at 100 Mager Lane, Hutto,Texas 78634) is anticipated to include the following: Demolition of approximately 15,000 square foot existing building. Construction of approximately 37,000 square feet of new, two story additions. Renovations to remaining 60,000 square feet of existing building to include new sprinkler system, new HVAC controls and HVAC outside air units, new kitchen serving line and some kitchen equipment, reconfiguration of some rooms and finishes. Exterior work to include relocating the playground, some new vehicular drives and drop off canopies, piping storm sewer, new exterior lighting, some utility relocation, and new landscaping at front and in courtyard. The estimated construction cost is $12,193,000.00. Project C: Various Elementary Renovations The District anticipates phased renovations for each of the schools included in the Project. Renovations of existing classrooms to support district-wide project-based learning (PBL) learning initiatives, lighting retrofits, roofing, kitchen serving line renovation at Nadine Johnson Elementary School, civil improvements, and technology and campus-wide AV upgrades. The estimated construction cost is $7,000,000.00.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents