Similar Projects
Lamar Boulevard Offices
New Construction - 180,000 SF
Design
$100,000,000 est. value
Austin, TX 78704

Spring Valley Road Development
New Construction - 15,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Richardson, TX 75082

Family Dollar
New Construction - 10,500 SF
Bidding by Invitation
$450,000 est. value
Munday, TX

Walmart Supercenter #4538-603 - CAPXREF-2
Renovation
Bidding by Invitation
Katy, TX 77449

O'Reilly Auto Parts #609
Addition - 2,579 SF
Post-Bid
Rockport, TX 78382

Bath & Body Works #2558
Build-Out - 3,335 SF
Post-Bid
El Paso, TX 79936

New Administration Building
New Construction
Results
$1,000,000 to $5,000,000 est. value
Fort Hood, TX

Addicks and Barker Project Office Building Construction
New Construction - 7,592 SF
Results
$5,000,000 to $10,000,000 est. value
Houston, TX 77077

Stacy Green
New Construction
Construction
Allen, TX 75013

Stacy Green
New Construction
Construction
Allen, TX 75013

TFC Building LBJ 1st and 11th Floor
Renovation - 23,381 SF
Pending Verification
$4,000,000 est. value
Austin, TX 78701

Moody Sales Center Bulletin 1
Renovation - 1,000 SF
Pending Verification
$85,000 est. value
Austin, TX

Cedar Hill Development Phase I
New Construction
Design
$10,000,000 est. value
Cedar Hill, TX 75104

Dollar General #22057
New Construction - 9,122 SF
Post-Bid
$600,000 est. value
San Antonio, TX 78224

Elevator Modernization Services
Term Contract
Results
Less than $547,000 est. value
Austin, TX 78703

Last Updated 11/19/2020 09:42 AM
Project Title

Main and Chestnut Property

Physical Address View project details and contacts
City, State (County) Forney, TX 75126   (Kaufman County)
Category(s) Commercial
Sub-Category(s) Office, Retail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Development of an approximately 4.1275 acre site in Downtown Forney, TX. The Site is located east on Main Street at the northeast corner of Main Street and Chestnut Street. It sits adjacent to a Union Pacific rail line. The Site will serve as a central anchor and gateway to the downtown core from the east. Its lies near and in proximity to Community Park, Bell Park, downtown commercial core and surrounding residential neighborhoods, and several municipal services such as City Hall, Fire Station #1 and Development Services.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents