Similar Projects
Holiday Park Sanitary Sewer Extension Project - Sewer and Force Main Construction
Results
$1,800,000 to $2,000,000 est. value
Harrisburg, PA 17111

2019 Sanitary Sewer System Improvement Project - Force Main Replacement
Results
Middletown, PA 17057

Mary Alley Sewer Replacement Project
Results
$145,000 to $185,000 est. value
Highspire, PA 17034

CCTV Inspection and Repair Project – Edgmont, Middletown and Rose Valley
Results
$870,000 to $970,000 est. value
Edgemont, Middletown, Rose Valley, PA

Arsenal Boulevard Sewer Improvements - Phase 1
Results
$2,300,000 to $2,700,000 est. value
Harrisburg, PA 17103

2019 Sanitary Sewer and Storm Sewer Rehabilitation (2019-10)
Results
Hershey, PA 17033

2019 Sanitary Sewer System Improvement Project - General Construction
Results
Middletown, PA 17057

2020 Sewer System Improvements
Results
$2,000,000 to $2,900,000 est. value
Harrisburg, PA 17101

Maintenance and Emergency Repairs to the Wastewater and Stormwater Collection Systems
Results
Harrisburg, PA 17109

Southeast Sewer Extension
Results
$2,800,000 to $3,000,000 est. value
Harrisburg, PA 17110

2020/2021 Lining Project
Term Contract
Results
Harrisburg, PA 17109

Highway Inlets Boxes, Grates, Frames Supplement 2
Results
Harrisburg, PA 17102

2019 Sanitary Sewer and Storm Sewer Replacement Project (2019-09)
Results
Hershey, PA 17033

Maintenance and Emergency Repairs to Wastewater Collection System
Results
Harrisburg, PA 17110

2020 Sewer Replacement
Results
Royalton, PA 17057

Last Updated 08/19/2020 08:52 AM
Project Title

2020 Sewer Replacement and Rehabilitation Project CIPP Lining

Physical Address View project details and contacts
City, State (County) Royalton, PA 17057   (Dauphin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for this Contract consists of the installation of 8-inch diameter cured-inplace pipe (CIPP) liner on Wyoming Street in Royalton Borough, Pennsylvania. The scope of work generally includes, but is not limited to, installation of approximately 400 linear feet of 8-inch diameter CIPP liner; pre-lining cleaning and pipe preparation; pre-lining and post-lining CCTV; reinstatement of lateral connections; internal cutting/grinding of laterals as needed; chemical grouting; erosion and sedimentation controls; bypass pumping as needed; and all other work identified in the Contract Documents

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents