Similar Projects
Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Vermillion Acres Senior Housing
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Hastings, MN 55033

Vermillion Acres Senior Housing
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Hastings, MN 55033

South Valley Park Phase 1 Improvements
Infrastructure
Bidding
$260,000 CJ est. value
Inver Grove Heights, MN 55076

North Creek Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Lakeville, MN 55024

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Hastings HS Tennis Court Replacement
Post-Bid
Hastings, MN 55033

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

2021 Crack Sealing and Seal Coating
Results
MN

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Cliff Road Multi-Residential
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Eagan, MN 55122

Cliff Road Multi-Residential
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Eagan, MN 55122

Kelley Park Master Plan
Infrastructure
Conception
$1,000,000 CJ est. value
Apple Valley, MN 55124

Last Updated 09/15/2022 04:31 PM
Project Title

Ipava Avenue and 165 th Street W Mill and Overlay Project

Physical Address View project details and contacts
City, State (County) Lakeville, MN 55044   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,677,921 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 15,2022, project was awarded to McNamara Contracting, awarded amount is $1,677,920.80.** construction, complete in-place, of the following approximate quantities: 9,500 L F Remove and Replace Concrete Curb and Gutter 54,000 S Y Mill Bituminous Pavement - 2" 60,000 S Y Bituminous Underseal ("Texas Underseal") 6,800 TON Type SP 12.5 Wearing Course Mix (3,B) 25,000 L F Pavement Markings 6 EACH 2'x3" - 60" Storm Sewer Drainage Structures 130 EACH Adjust Casting/Valve Box The Owner reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interests of the Owner. No bids may be withdrawn for a period of sixty (60) days from the date of opening of bids. The City of Lakeville reserves the right to reject any or all bids. CONTRACTOR ACKNOWLEDGEMENTS: (1) Any prime contractor or subcontractor that does not meet the minimum criteria established for a "responsible contractor" as defined in Minn. Stat. 16C.285, subd. 3, or fails to verify that it meets those criteria is not a responsible contractor and is not eligible to be awarded a construction contract for the Project or perform work on the Project. (2) Responsible contractors shall submit to the City a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minn. Stat. 16C.285, subd. 3, at the time that it responds to this solicitation document. (3) A prime contractor shall submit to the City, upon request, copies of the signed verifications of compliance from all subcontractors. (4) A false statement under oath verifying compliance with any of the minimum criteria shall make the prime contractor or subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a prime contractor or subcontractor that submits a false statement.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents