Last Updated | 10/04/2022 11:32 AM |
Project Title | HVAC RTU Repairs |
Physical Address | View project details and contacts |
City, State (County) | New Orleans, LA 70117 (Orleans County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $19,115 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and lo complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive Sanchez Multi-Service Center - 1616 Caffin: HVAC Repair. 1. Multi-purpose area. a. HVAC Repair. - Room is hot. - RTU4. 1. Compressor has failed. b. Investigate/Repair/Replace. - Remove and replace compressor with new. - Remove and replace condenser coil with new. - Fill system with refrigerant. - - Sensors. 1. Remove and replace the Indoor Air Quality Sensor with new. 2. Remove and replace the Supply Air Temperature Sensor with new. - Start and test HVAC system. c. HVAC to be fully functioning before leaving. Remove all construction debris and.dispose.off site. Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. Clean area when work is complete. Area to be ready for business use when finished. If any equipment is found to be defective it is lo be identified to owner for approval of repair/replacement. All material shall conform to the latest issue of all applicable standards established by NEMA, and underwriters laboratories, inc. and shall bear manufacturer ' s. trade and brand.name. All work shall be installed and completed with the latest rules and regulations of the ASME, NFPA,NEC and all Slate and local codes and standards and such work not so installed shall be removed and reinstalled at the Contractor ' s expense. Warranties on all furnished equipment and industry standards on parts and labor, all manufacturers warranties should apply. Personal Protective Equipment to be worn at all times and a safe working environment is to be maintained Q and a open: September 14, 2022 1:00:00 PM Q and a close: September 19, 2022 1:00:00 PM |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |