Similar Projects
Bridge and Dam Repair
New Construction, Infrastructure
Bidding
$50,000 est. value
Spicer, MN 56288

Plum Street Storm Tunnel Repairs 2022
Renovation
Bidding
$300,000 est. value
Red Wing, MN 55066

Soudan Mine Shaft Rehabilitation
Renovation, Alteration
Post-Bid
$6,923,092 est. value
MN 55782

Lake Carlos Dam Rock Arch Rapids
Results
$250,000 est. value
Carlos, MN

Farney Creek Dam Repair and Pipe Replacement
Results
MN

Patricia Zakovec Impoundment Water Control Structure
New Construction
Bidding
$105,000 est. value
Elmer, MN 55765

Repair Tunnel Waterproofing
Renovation
Results
$250,000 est. value
Saint Paul, MN

Central City Parallel Tunnel
Results
MN

Shakopee Lake Dam Repair
Renovation
Results
$802,300 est. value
Benson, MN

Camden State Park Brawner Dam Rehabilitation
Renovation
Results
$435,467 est. value
Russell, MN

Trout Brook Interceptor Storm Tunnel Repair
New Construction
Results
Saint Paul, MN

West Leaf Lake Dam Modification and Fish Passage
Renovation
Results
MN

MNSU Tunnel Repairs
Renovation
Results
Blue Earth, Mankato, MN 56001

2022 Delta Building B Tunnel Water Mitigation
Infrastructure
Results
Saint Paul, MN 55111

Lock and Dam Strain Gauge Monitoring - LD 3, 4 and 6
Renovation, Term Contract
Results
Welch, MN - Alma, Trempealeau, WI

Last Updated 06/03/2022 12:37 AM
Project Title

2022 MSP Tunnel Grouting

Physical Address View project details and contacts
City, State (County) Bloomington, MN   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $290,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Project includes, but is not limited to the following 1. Tunnel grouting and crack sealing in the MSP tunnel. 2. CONTRACTOR shall clean and remove material in the tunnel that will obscure observation of grouting and crack sealing operations. 3. CONTRACTOR shall grout, and crack seal specified locations in the tunnel on Track 2, the south bound LRT tunnel. 4. CONTRACTOR may use water supplied by the COUNCIL. This water will be supplied by a hose bib inside of a pump room just outside of the tunnel south entrance. Contractor shall gain access to the pump room and coordinate use of the hose connection with the CAR. 5. CONTRACTOR shall clean and sweep tunnel clear of debris at completion of work and before train use. 6. CONTRACTOR will have access to store materials and equipment in cross passage 1 and 2 prior to the 1st shutdown. Access will be given between Midnight and 3 AM with prior authorization. Metro Transit will supply a hi-rail vehicle to help transport materials and equipment. 7. CONTRACTOR is responsible for supplying hi-rail vehicles for all their work. 8. CONTRACTOR will must obtain rail insurance.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents