Last Updated 06/10/2021 08:56 AM
Project Title

Pine Ridge Water Main Extension

Physical Address View project details and contacts
City, State (County) Carleton, MI   (Monroe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of the installation of approximately 70 LF -eight inch HDPE Directional Drill 2000 Pressure Class and 2500 lineal feet of 8-inch PVCO C909 water main by open cut along with approximately along with gate valves and wells and new fire hydrants. An optional bid of directional drilling approximately 2500 lineal feet of eight inch HDPE 200 Pressure Class water main is acceptable. In addition to the placement of the water main there are seven (7) new water services, an eight inch GV&W and five fire hydrants to be installed as part of the overall project. The anticipated start date, weather permitting, is approximately 4/5/2021 and substantially completed by 6/18/2021 and final completion by 7/1/2021.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents