Project Title | Pine Ridge Water Main Extension |
Physical Address | View project details and contacts |
City, State (County) | Carleton, MI (Monroe County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed project consists of the installation of approximately 70 LF -eight inch HDPE Directional Drill 2000 Pressure Class and 2500 lineal feet of 8-inch PVCO C909 water main by open cut along with approximately along with gate valves and wells and new fire hydrants. An optional bid of directional drilling approximately 2500 lineal feet of eight inch HDPE 200 Pressure Class water main is acceptable. In addition to the placement of the water main there are seven (7) new water services, an eight inch GV&W and five fire hydrants to be installed as part of the overall project. The anticipated start date, weather permitting, is approximately 4/5/2021 and substantially completed by 6/18/2021 and final completion by 7/1/2021. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |