Similar Projects
New A/C Unit for Ft Dodge
Renovation
Design
$100,000 CJ est. value
Anamosa, IA 52205

Southwest Valley High School Boiler and Gym Heating, ventilation, and air conditioning (HVAC) Replacement
Renovation
Sub-Bidding
$3,000,000 CJ est. value
Corning, IA 50841

Madrid Junior/Senior High School HVAC Improvements - Phase 1
Renovation
Sub-Bidding
$947,000 CJ est. value
Madrid, IA 50156

Chiller Replace - Roundy Elementary School
Alteration
Post-Bid
Columbus Junction, IA 52738

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Bettendorf High School – Dust Collector Replacement
Alteration
Results
Bettendorf, IA 52722

Aquatic Center HVAC Replacement
Alteration
Results
North Liberty, IA 52317

East High School HVAC Upgrades
Renovation
Sub-Bidding
$400,000 CJ est. value
Des Moines, IA 50316

Ho-Chunk to Heritage Parking Ramp Skywalk Upgrades
Alteration
Post-Bid
Sioux City, IA 51101

Removal and Replacement of Two Air Supply Units
Alteration
Results
$250,000 est. value
Davenport, IA 52801

Story County Human Services Center HVAC Equipment Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Ames, IA 50010

Hawthorne Elementary HVAC Upgrades
Alteration
Post-Bid
Keokuk, IA 52632

Building S-38 Vehicle Exhaust Upgrades
Alteration
Results
Johnston, IA

Ericson Public Library 2023 HVAC Improvements
Renovation
Sub-Bidding
$700,000 CJ est. value
Boone, IA 50036

Laboratory Freezer
Alteration
Post-Bid
Davenport, IA

Last Updated 12/19/2022 01:37 PM
Project Title

Lamoni CSD HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Lamoni, IA 50140   (Decatur County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Copy Center - 11/21/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consist of fire suppression for the Middle School. Work will coincide with HVAC upgrades during the summer of 2023. Each Bidder' shall accompany its bid with bid security in a separate, sealed envelope as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work. The Bidder's security shall be in an amount equal to five percent (5%) of the amount of the bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the Board of Directors of Lamoni Community School District. The bid shall contain no condition except as provided in the specifications. Bid security shall be made payable to Lamoni Community School District . The successful Bidder will be required to furnish within ten (10) days of the award proof of insurance as required by the Bid Documents and a Performance Bond and Labor and Material Payment Bond both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. The Board of Directors may make the contract award to the lowest responsive, responsible bidder meeting specifications. The right is reserved to reject any or all bids, or any part thereof, and to waive informalities as allowed by law, and to enter into such contract or contracts as shall be deemed in the best interests of Lamoni Community School District Should the successful bidder fail or neglect to furnish satisfactory performance/payment bonds, or proof of insurance, refuse to enter into a Contract on the basis of the bid, or fail to meet the requirements of this Notice and the specifications regulating the award, the bidder's security may be retained as liquidated damages. No bidder may withdraw its bid for a period of sixty (60) calendar days after the date and hour set for opening of bids. Work on the Project shall commence as soon as possible after award of the Contract and is scheduled for multiple substantial completion dates as outlined in the specifications. The last substantial completion date will be on Wednesday, August 16 th , 2023, with Final Acceptance to be no later than ninety (90) days after substantial completion The Project consist of fire suppression for the Middle School. Work will coincide with HVAC upgrades during the summer of 2023 Low Bids: Bid Package A General Trades: Boyd Construction $598,030 Bid Package B Fire Supression: Midwest $78,500 Bid Package C Mechanical: Dahl Mechanical $1,949,000 Bid Package D Electrical: Van Maanen Electric $450,463

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents