Similar Projects
New Public Safety Building - City of La Crosse
New Construction, Renovation
Conception
$33,000,000 est. value
La Crosse, WI

Station 3 Construction Phase 2 - City of Sheboygan
Renovation
Conception
$4,000,000 CJ est. value
Sheboygan, WI 53081

EMS and Police Department Facilities Remodel
Renovation - 2,299 SF
Design
Sun Prairie, WI 53590

New Fire Station 4 - City of La Crosse
New Construction, Infrastructure
Design
$8,225,000 CJ est. value
La Crosse, WI 54603

La Crosse Fire Station #4
Demolition, New Construction, Renovation - 20,000 SF
Bidding
$5,900,000 CJ est. value
La Crosse, WI 54603

Public Safety Building North Employee Washroom Remodel
Build-out
Bidding
$170,000 CJ est. value
Kenosha, WI 53140

Laona EMS Building - Bid Pack 3
New Construction, Infrastructure - 9,060 SF
Sub-Bidding
$1,600,000 CJ est. value
Laona, WI 54541

Fire Training Tower
New Construction
Post-Bid
Camp Douglas, WI 54618

Madison Fire Station 6 Remodel
Addition, Demolition, Build-out, Infrastructure
Post-Bid
$5,435,131 CJ est. value
Madison, WI 53713

Racine County Sheriff's Office Training Center
New Construction
Results
Racine, WI 53402

La Crosse Fire Station 2
New Construction - 20,680 SF
Results
$5,500,000 est. value
La Crosse, WI 54601

Whitehall Fire Station Roof Replacement
Renovation
Construction
$253,444 CJ est. value
Whitehall, WI 54773

Police Station Expansion - City of Neenah
Addition
Pending Verification
$4,700,000 CJ est. value
Neenah, WI 54956

New Fire Station - City of Platteville
Demolition, New Construction, Infrastructure - 32,000 SF
Pending Verification
$16,000,000 CJ est. value
Platteville, WI 53818

Fire Station - City of Cudahy
New Construction, Infrastructure
Conception
$900,000 CJ est. value
Cudahy, WI 53110

Last Updated 04/05/2023 12:02 AM
Project Title

Police Department Renovation Project One

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54935   (Fond du Lac County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project quantities includes but are not limited to the following described approximate quantities of work: SCOPE OF WORK General Contractor to complete: o Renovations and construction of women's locker room o Renovations of men's locker room o Renovations of office space HVAC mechanical purchased by Owner, and should not be included in the bid. Lockers have been purchased by Owner, and should not be included in the bid. Proposals may not be delivered by facsimile transmission or other telecommunication or electronic means. Each bid envelope shall be properly identified on the face thereof "SEALED BID - POLICE DEPARTMENT RENOVATION PROJECT ONE". No bid shall be withdrawn for a period of (30) thirty days after the opening of said bids, without the consent of the Deputy Procurement Officer. The City of Fond du Lac may reject any or all bids on any basis and without disclosure of any reason. The failure to make a disclosure shall not result in accrual of any right, claim or cause of action against the City. The City also reserves the right to waive any formalities or informalities in bidding, and to select the bid that, in its opinion, will best serve the interests of the City. No bid will be opened unless the "Bidder's Proof of Responsibility" for 2022 is filed and approved at least (5) five days before the scheduled time for opening of bids. Reference is made to Section 66.0901(2) & (3) Wisconsin Statutes. The Director of Public Works decision as to qualifications shall be final. The Bidder's Proof of Responsibility can be found at portal. Each proposal shall be accompanied by a certified check, or bank draft, payable to the City of Fond du Lac, or satisfactory bid bond, in the amount of 5% of the gross bid as a guarantee that if the bid is accepted as the successful bid, such successful bidder will execute and file the proposed contract and performance bond within ten (10) days after notice of award of contract.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents