Similar Projects
County-Wide Refuse Services
Infrastructure
Bidding
GA

Solid Waste Collection and Disposal Services
Term Contract
Bidding
Waynesboro, GA

Waste Disposal Services DBHDD Hospitals
Term Contract
Post-Bid
Gracewood, Milledgeville, GA

Waste Disposal Services DBHDD Hospitals
Term Contract
Post-Bid
Gracewood, Milledgeville, GA

1 Pressure-Treated Yellow Pine Lumber
Results
Chester, GA 31012

Grinding, Mulching and Hauling of Storm Waste Material
Results
Woodbine, GA 31569

Residential Curbside Solid Waste and Recyclable Collection Services
Term Contract, Infrastructure
Bidding
Kingsland, Saint Marys, Waverly, White Oak, Woodbine, GA

Disaster Debris Recovery Services
Post-Bid
Tybee Island, GA 31328

Debris Removal and Disposal Services
Results
GA

Test Pit Excavation and Potential Removal of Underground Storage Tank
Infrastructure
Bidding
Savannah, GA

Timber Sale - Alexander WMA
Post-Bid
GA

Collection of Residential Solid Waste
Results
Macon, GA

Collection of Commercial Solid Waste
Infrastructure
Bidding
Macon, GA

Timber Sale - Ocmulgee WMA
Post-Bid
GA

Bldg. 2200 Replace Concrete from A1 to A10 Craneway
Results
Albany, GA

Reported 05/28/2021 12:00 AM
Project Title

Solid Waste Collection Administrative Building Improvements Fy 2021

Physical Address View project details and contacts
City, State (County) Statesboro, GA   (Bulloch County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work in this contract includes the renovation of the SWC building to allow overnight or extended stay for city employees during natural disasters by separating one large restroom into two separate restrooms, building a new shower room and building an office space for the SWC Assistant Superintendent. • Install three metal frame walls 15’L X 12’H • Install one metal frame wall 11’- 5” X 12’H • Install one metal frame wall 4’ X 12’ H • Remove one existing wall • Cover all walls with 5/8” dry wall and finish to 11’H • Rework ceiling grid to new walls • Move/add grills for HVAC/lighting • Add electrical and plumbing to new walls • Add three 3070 Steel Jamb/doors to match existing with keyed lock • Rubber base to match existing • Paint to match existing • Install shower/plumbing and any required backing • Install one sink/plumbing in new restroom • Relocate existing sink/plumbing in separate restroom

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents