Similar Projects
Desilt Drainage Structures
Bidding
$85,000 est. value
FL

Desilt Box Culverts with Repairs
Bidding
$750,000 est. value

Design-Build Services for Moultrie Trails Area Drainage Improvements
Results
Less than $1,997,028 est. value
Saint Augustine, FL 32084

Dredged Material Management Area Du-2 and SJ-1 Shoreline Improvements
Results
Less than $1,467,747 est. value

Winton Circle Drainage Improvements
Bidding
FL 32086

Clean and Desilt Box Culverts
Results
Less than $250,000 est. value

Kings Road Drainage Improvements
Bidding
FL 32086

Santa Maria Boulevard Drainage Improvements
Results
Less than $2,173,000 est. value
Saint Augustine, FL 32084

3rd Alley Ditch Drainage Improvements
Results
Saint Augustine, FL 32080

Deep Creek Conservation Area - Ditch Blocks Installation
Results
Less than $59,310 est. value
FL

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Second Call - Halfmile Creek Mitigation Area, Trail Road Improvements and Low Water Crossing
Results
Less than $22,000 est. value
FL

Fabrication and Installation of Removable Flood Barriers for the Waste Water Treatment Plant
Results
Saint Augustine, FL

FEMA Project - Old A1A South Berm Restoration
Results
Less than $1,152,098 est. value
FL

Drainage Repair on SR 207
Results
Less than $240,000 est. value
FL

Last Updated 07/08/2020 11:04 AM
Project Title

CDBG-DR Project: Avenue D and Tart Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32084   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $680,364
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to construct new cross drains across Tart Road and Old Lewis Speedway and construct a pipe network along Porter Road and Avenue D to replace the existing ditch system on the west side of the roadway. Work also includes cross drain replacement, erosion control measures, pavement cut/repair, maintenance of traffic, signing, pavement marking, and utility adjustments. The intent is to provide for the construction and completion in every detail of the work described in the Contract Documents. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, required to complete the work in accordance with the Plans, SJCUD Manual of Water, Wastewater and Reuse Design Standards, Specifications, permit requirements and terms of the Contract. Within the same Bid but funded separately by the City of St. Augustine are utility relocations. Relocation of adjacent private utilities by others shall be accommodated. All work shall be performed in accordance with the plans and specifications. Pre-Bid Meeting Link: https://sjcpublicworks.my.webex.com/webappng/sites/sjcpublicworks.my/meeting/download/5cb3c2a1404542f084be0f832b9edfb0?siteurl=sjcpublicworks.my MTID=m19d157b53ab817b138d9ab43708c3fde.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents