Similar Projects
Phase III Boston Post Road (Route 20) Water Main Improvements
Post-Bid
Less than $1,400,000 est. value
Wayland, MA 01778

Water Meter Upgrade
Post-Bid
Uxbridge, MA

Construction of Nemasket River Water Main Crossing at Wareham Street
Results
Less than $300,000 est. value
Middleborough, MA

Z--CACO Chlorination Upgrades to Eight Public Water S
Results
$25,000 to $100,000 est. value
MA

Automatic Meter Reading System
Term Contract
Post-Bid
Lexington, MA 02420

Water Mains and Appurtenances - Cedar Street Area and Hanlon Road
Results
Less than $1,300,000 est. value
Holliston, MA 01746

Supply of AMI Equipment - Contract 5
Post-Bid
Less than $590,000 est. value
Fall River, MA

Ductile Iron Pipe and Fittings
Results
Danvers, MA

Fire Alarm and Sprinkler System Maintenance and Repair Services
Post-Bid
Less than $202,500 est. value
Brookline, MA

Gates Field Irrigation System Rehabilitation
Results
Less than $47,500 est. value
Danvers, MA

Ghosh Building Fire Protection Remediation
Post-Bid
$386,900 est. value
Worcester, MA

Route 6 Watermain Crossing
Results
$135,000 to $200,000 est. value
Sandwich, MA

Inspection, Testing, Maintenance, and Certification of Approximately 150 MBTA Standpipes Zones
Post-Bid
Boston, MA

Water Main Replacement on Arnold Court
Results
Less than $250,000 est. value
Cheshire, MA

Fire Hydrants
Term Contract
Post-Bid
Billerica, MA 01821

Last Updated 09/16/2020 09:31 AM
Project Title

Installation of an 8" Water Service Across Route 202 (State Street)

Physical Address View project details and contacts
City, State (County) Belchertown, MA   (Hampshire County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of an 8" water service across Route 202 (State Street) located in Belchertown MA (Project No. 21-001). Work includes but not limited to excavating a test pit, roadway saw cutting, trench excavation, installation of a 12"x8" Wet Tap and valve, installation of approximately 100 linear feet of 8" Ductile Iron Pipe water main and appurtenances, trench restoration via excavatable flowable fill backfill and 6" of bituminous binder course.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents