Similar Projects
East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

Construct Park and Ride Area
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Tyndall AFB, FL

Sidewalk Repair
Infrastructure
Bidding
$53,497 est. value
FL

Oakridge Road Pedestrian Safety Improvement
Infrastructure
Bidding
$11,580,597 est. value
Orlando, FL 32885

I-75 MLK DDI
Post-Bid
FL

District Seven FCO Structures and Sidewalk Project
Post-Bid
Less than $261,000 est. value
Clearwater, FL 33760

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Sidewalk Concrete Repairs and Construction
Term Contract
Results
$1,000,000 est. value
Orlando, FL 32802

LDS Church - Ocala Stake Suite and Parking Lot Additions
Addition - 1,700 SF
Construction
Ocala, FL 34471

FedEx Ocala Hub Parking Expansion
Addition
Construction
Ocala, FL 34475

Amazon Delivery Station
Build-Out, Infrastructure - 120,282 SF
Pending Verification
Riviera Beach, FL 33404

Neighborhood Sidewalk and ADA Ramp Program FY18 - SHELTERED
Infrastructure
Bidding
Saint Petersburg, FL 33703

City Parking Lot Projects
Post-Bid
Plant City, FL 33563

Devilliers Street Revitalization, Phase 1: from Main Street to Garden Street
Results
Pensacola, FL

Construction of the Northport 24" Force Main on Glades Cutoff Road
Infrastructure
Bidding
FL

Last Updated 10/15/2021 11:58 AM
Project Title

County Road 283 North Multi Use Path

Physical Address View project details and contacts
City, State (County) DeFuniak Springs, FL   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To improve pedestrian and bicyclist safety and access by constructing an 8-ft wide multi-use path along County Road 283 from North of US Highway 98 to East Mitchel Avenue. The proposed alignment runs approximately 6-ft to 10-ft off the eastern edge of County Road 283. The project consists of the construction of a multiuse path, regrading of existing driveways, signing and markings, and the maintenance of traffic needed to construct the multi-use path.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents