Similar Projects
CSAH 3 Pavement Rehabilitation - Tall Pines to I35
Infrastructure
Bidding
MN

Bituminous Milling, Full Depth Reclamation
Infrastructure
Bidding
MN

Bituminous Paving of Vails Lake Road
Post-Bid
Paynesville, MN

Ingman Minimum Maintenance Road Repair
Post-Bid
$25,000 est. value
Hill City, MN

CSAH 42/Akron Avenue Intersection Improvements
Results
Less than $2,700,000 est. value
Hastings, MN 55033

2021 Micro Surfacing and Chip Seal
Results
Champlin, Independence, Maple Grove, Minnetrista, MN

Springview Meadow Residential Development
New Construction, Infrastructure
Construction
Prior Lake, MN

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

E 4th St. Apartment Building
Renovation, Infrastructure
Pending Verification
Less than $1,100,000 est. value
Duluth, MN 55805

2021 Chester Woods Multi-Use Path from Towne Club Parkway Southeast to 19 Street Southeast
Infrastructure
Bidding
Rochester, MN 55904

Lewiston Road Upgrade/Maintenance
Renovation, Term Contract
Post-Bid
Lewiston, MN

Grading, Bituminous And Concrete Surfacing, Ada Improvements, Tension Cable Guardrail, And Lighting Concrete Pavement Rehabilitation And Diamond Grinding
Results
MN

Industrial Boulevard Acres Apartments
New Construction, Infrastructure
Pending Verification
Waconia, MN 55387

2021 Chip Seal and Parking Lot Chip Seal
Post-Bid
$163,426 est. value
Brainerd, MN

Veteran's Memorial Improvements
Renovation
Results
Less than $180,000 est. value
Milaca, MN

Last Updated 11/02/2021 09:51 AM
Project Title

Wagon Wheel Trail - Phase 1 Paving

Physical Address View project details and contacts
City, State (County) La Crescent, MN   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of the work involved is furnishing all labor and materials for construction of the Wagon Wheel Trail - Phase 1 Paving together with related subsidiary and incidental work including: The project consists of: Aggregate Base, Bituminous Paving, and miscellaneous restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents