Similar Projects
Linear Park Expansion, North Side to South Side - City of Battle Creek
Infrastructure
Conception
$2,500,000 CJ est. value
Battle Creek, MI 49015

McCamly - Van Buren Signal Modernization - City of Battle Creek
Infrastructure
Conception
$370,000 CJ est. value
Battle Creek, MI 49017

Coldwater Senior Villas
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Coldwater, MI 49036

Pansophia Academy Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Coldwater, MI 49036

Mainland Warehouse Phase 2 Addition
Addition, Demolition, Infrastructure - 1,324 SF
Bidding
$531,939 CJ est. value
Mackinaw City, MI 49701

Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulders and Pavement Markings on Old US 27
Infrastructure
Bidding
$489,000 CJ est. value
Marengo Township, MI 49068

Smith Court Water Main Improvements Project
Infrastructure
Post-Bid
Benton Harbor, MI 49022

2022 Water Main and Road Reconstruction Project
Infrastructure
Post-Bid
Oak Park, MI

Water And Wastewater Asset Management Plan Services
Results
MI

Ebersole Environmental Center Site Improvements
Infrastructure
Results
Wayland, MI 49348

2022 Whippoorwill/Greenwood Street Sanitary Sewer and Water Main Improvements and Village-Wide Sanitary Sewer CIPP Project
Infrastructure
Construction
$787,414 CJ est. value
Middleville, MI 49333

2022 Whippoorwill/Greenwood Street Sanitary Sewer and Water Main Improvements and Village-Wide Sanitary Sewer CIPP Project
Infrastructure
Construction
$787,414 CJ est. value
Middleville, MI 49333

Lofts on Lake Street
New Construction, Infrastructure - 9,025 SF
Pending Verification
$5,000,000 CJ est. value
Boyne City, MI 49712

Harvest Meadows Phase II Condominiums
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Leighton Township, MI 49348

West Michigan Avenue Corridor Improvements - City of Battle Creek
Infrastructure
Conception
$1,500,000 CJ est. value
Battle Creek, MI 49037

Last Updated 02/13/2023 10:18 AM
Project Title

Otsego Lake Drain Outlet Control Structure Removal and Replacement Project

Physical Address View project details and contacts
City, State (County) Gaylord, MI 49735   (Otsego County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $409,970 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Invitations to Bid for the Otsego Lake Drain Outlet Control Structure Removal and Replacement project. Removal of existing CMP outlet control structure, 48-inch dia outlet pipe, construction of new outlet control structure including concrete weir, sidewalls, headwall, and wingwalls, placement of new 48-inch dia concrete pipe, aluminum safety railing, ladder, access hatch, and associated restoration. Each Bid package shall be accompanied by a certified check, cashiers check, money order, or bid bond, in the amount of at least five (5) percent of the amount bid, drawn payable to Otsego County as security for the proper execution of the Agreement. Otsego County reserves the right to accept or reject any or all bids and to waive any informality in any bids should it consider same to be in its best interest. All inquiries shall be directed to Paul Repasky, PE, at Phone: 989.732.3584 Bids may not be withdrawn for the period of sixty (60) days after date of receiving bids. Wade Trim, Inc. 4241 Old US 27 South, Suite 1 Gaylord, MI 49735 Otsego County 225 W Main, Suite 203 Gaylord, MI 49735

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents