Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

2021-2023 Street Sweeping Program
Post-Bid
Roselle, IL

Pavement Resurfacing
Post-Bid
Burr Ridge, IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

2021 MFT Road Program
Post-Bid
Burr Ridge, IL

RR-20-4544 - M-8 Maintenance Facility Westbound Access Road
Renovation
Results
Oak Brook, IL 60521

Repair Roads and Concrete
Post-Bid
$500,000 est. value
Glen Ellyn, IL

2021 Street and Pavement Patching Programs
Results
Roselle, IL

Earthwork
Post-Bid
Glendale Heights, IL 60139

2021 Paving
Results
Clarendon Hills, IL

2021 Crack Sealing Bituminous Pavement
Post-Bid
Bloomingdale, IL

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Pavement Resurfacing
Post-Bid
Naperville, IL

2021 Street Resurfacing ST-004(B)
Results
Downers Grove, IL

Last Updated 08/09/2022 03:01 PM
Project Title

St James Farm Near Warrenville - DuPage County

Physical Address View project details and contacts
City, State (County) Warrenville, IL 60555   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2020
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to construct the .6-mile trail along the south side of Mack Road, from Winfield Road east to an existing service driveway. The new trail will connect to an existing path along Winfield and to a future trail through Cantigny Park. As of November 16, 2018, this project is in preliminary stage of planning. A design timeline is projected to begin in 2019, with construction in spring 2020 and be completed in the summer of 2020.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents