Similar Projects
Barbara W. Smith Family Life Center Steam Lab
Renovation - 50,000 SF
Bidding
$70,000 CJ est. value
South Holland, IL 60473

Remove and Replace Existing Elevator Flooring at Various CTA Locations
Renovation
Sub-Bidding
$350,000 CJ est. value
Chicago, IL 60604

Bell ES - Gym Floor Replacement
Renovation
Sub-Bidding
$177,000 CJ est. value
Chicago, IL 60618

Terrazzo Floor Refinishing at Oakwood School
Alteration
Post-Bid
$200,000 est. value
Lemont, IL 60439

27th Floor RJDC Project
Alteration
Post-Bid
$900,000 est. value
Chicago, IL 60602

Gym Floor and Bleacher Replacement
Renovation, Alteration
Results
Streamwood, IL 60107

Highcrest Middle School Flooring
Alteration
Results
$200,000 est. value
Wilmette, IL 60091

Hanson Park ES - Gym Floor Replacement
Renovation
Sub-Bidding
$95,455 CJ est. value
Chicago, IL 60639

Kinzie Floor Tile Installation
Alteration
Post-Bid
$30,000 est. value
Chicago, IL

Gymnasium Floor
Alteration
Results
$100,000 est. value
Chicago, IL 60632

Bell ES - 3rd Floor Carpet Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Chicago, IL 60618

2022 Wood Floor refinishing work at Palatine, William Fremd, James B. Conant, Schaumburg, and Hoffman Estates High Schools
Alteration
Post-Bid
$200,000 est. value
Palatine, IL

Mae Jemison Elementary School Gym Floor Replacement
Alteration
Results
$60,000 est. value
Hazel Crest, IL 60429

Rogers Elementary School - Gym Floor Replacement
Renovation
Sub-Bidding
$225,000 CJ est. value
Chicago, IL 60645

Water and Electric Building A Structural Floor Replacement
Renovation
Post-Bid
$60,000 CJ est. value
Winnetka, IL 60093

Last Updated 01/03/2024 03:06 PM
Project Title

Flooring Improvements at the Village of Schiller Park Public Library

Physical Address View project details and contacts
City, State (County) Schiller Park, IL 60176   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $43,486 [brand] Estimate
Plans Available from Civil Engineer - 10/09/23
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 3, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The scope of work will include the following This project includes removal of existing carpet and replacement with either carpet squares or Luxury Vinyl Tile in the basement of the library. The base bid shall consist of pricing for carpet squares at all locations. The Library is also requiring pricing for installing Luxury Vinyl Tile at each of the locations. The Library reserves the right to choose whichever material is installed at each location. The total price for determining the lowest responsible bidder will be based upon the option chosen for each location by the Library. The Contractor is required to submit pricing for both materials, failure to do so may disqualify the bid. The contractor shall be responsible for proposing the sequence of construction to best suit his scheduling requirements. The Library retains the right to approve, reject, or modify the proposed sequence based upon its needs and concerns, which will be further presented and discussed at the preconstruction conference to be held for this project. Library issues such as parking and access will take precedence over contractor's scheduling needs, and no extension of time will be allowed in meeting the village's requirements with respect to the construction sequence. Notice is hereby given by the President and Board of Trustees of the Village of Schiller Park Library Board, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: Flooring Improvements at the Village of Schiller Park Public Library 4200 Old River Road This project includes removal of existing carpet and replacement with either carpet squares or Luxury Vinyl Tile in the basement of the library. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Schiller Park Library Board for a period forty- five (45) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. The successful bidder for the work will be required to furnish sufficient insurance to the Village of Schiller Park Library Board and the Engineer against all damage claims that might arise due to the negligence of the Contractor and will be required to furnish a Performance Bond and a Labor and Material Payment Bond in the amount of the contract. The Village of Schiller Park Library Board reserves the right in receiving these bids to waive technicalities and reject any or all bids.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents