Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Waterfront East
Demolition, LEED Certification, New Construction, Infrastructure - 300,000 SF
Conception
$100,900,000 CJ est. value
Vancouver, WA 98661

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

Westside Wastewater Treatment Facility (WWTF) Backflow Prevention Improvements
Infrastructure
Design
$95,500 CJ est. value
Vancouver, WA 98660

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Asphalt Overlay and Court Paint Resurfacing of the Pickeball Court
Infrastructure
Post-Bid
Washougal, WA 98671

SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Results
$20,000,000 est. value
WA

NE 99th Street - NE 94th Avenue to Vicinity of NE 117th Avenue
Infrastructure
Results
$16,894,000 to $19,710,000 est. value
Vancouver, WA 98687

Salmon Creek Memory Care
New Construction, Infrastructure - 40,705 SF
Construction
$15,000,000 CJ est. value
Vancouver, WA 98686

179th Apartments - East
New Construction, Infrastructure
Construction
$23,900,000 CJ est. value
Ridgefield, WA 98642

119th Cottages
New Construction, Infrastructure
Pending Verification
$18,400,000 CJ est. value
Vancouver, WA 98686

119th Cottages
New Construction, Infrastructure
Pending Verification
$18,400,000 CJ est. value
Vancouver, WA 98686

NE 90th Circle Apartments
New Construction, Infrastructure
Conception
$27,500,000 CJ est. value
Vancouver, WA 98665

SR 500 / I-5 to NE 112th Ave Vicinity - Replace Fiber
Infrastructure
Design
$553,000 CJ est. value
Vancouver, WA 98682

2022 Central Curb Ramps
Infrastructure
Post-Bid
$600,000 est. value
Vancouver, WA

Last Updated 02/14/2023 04:19 PM
Project Title

Knife River Concrete Batch Plant

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98662   (Clark County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a ready-mix concrete plant on 2.63 acres. Scope details have not been released. As of February 14, 2023 the project is in early planning. A pre-application meeting is scheduled for February 16, 2023 with Clark County Community Development. Information regarding the architect, general contractor and method of selection has not been released. A construction timeline has not been determined, but may begin in the fall of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents