Similar Projects
Take 5 Oil Change
New Construction - 1,432 SF
Conception
Less than $500,000 CJ est. value
Henderson, NV 89015

Retail at Inspirada
New Construction - 20,200 SF
Conception
$5,000,000 CJ est. value
Henderson, NV 89044

Tire Sales & Service
Renovation - 4,324 SF
Design
Las Vegas, NV 89121

Sahara Avenue Convenience Store and Gas Station
New Construction, Infrastructure - 9,343 SF
Design
$2,500,000 CJ est. value
Las Vegas, NV 89104

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Bidding
$1,500,000 CJ est. value
Henderson, NV 89015

Swift Lone Mountain
New Construction - 32,850 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
North Las Vegas, NV 89081

AutoNation Honda
Renovation, Addition - 233,323 SF
Post-Bid
Las Vegas, NV 89104

Break Masters / Henderson
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Henderson, NV 89052

Knight Transportation Addition
Addition - 11,700 SF
Construction
$350,000 est. value
North Las Vegas, NV 89081

Pacific Motorsports
Renovation
Pending Verification
Henderson, NV 89011

Tropicana and Spencer Vehicle Repair
Renovation - 8,622 SF
Pending Verification
Las Vegas, NV 89119

Galleria Fleet Maintenane Buliding Improvement For Equipment Shop - MF411 - City of Henderson
Renovation
Conception
$1,100,000 CJ est. value
Henderson, NV 89015

Eldorado Pass Travel Center
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Henderson, NV 89015

Strickland Brothers 10 Minute Oil Change / Las Vegas
New Construction - 1,725 SF
Post-Bid
$550,000 est. value
Las Vegas, NV 89135

AutoNation
New Construction - 24,091 SF
Construction
Las Vegas, NV 89149

Last Updated 01/03/2023 06:04 AM
Project Title

Government Center Automotive Shop - Clark County

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89155   (Clark County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined The project is included in the Clark County 2023-2027 Capital Improvement Plan (CIP). As of January 3, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents