Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

SR 500/NE Robinson Rd and NE 3rd St. - Intersection Safety Improvements
Infrastructure
Design
$4,459,000 est. value
Vancouver, WA 98687

I-5/NB Fourth Plain On Ramp - Ramp Meter
Infrastructure
Design
$375,000 est. value
Ridgefield, WA 98642

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Bidding
$210,000 est. value

Berth 17 Rehabilitation Project
Infrastructure
Bidding
$13,994,400 CJ est. value
Vancouver, WA 98660

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Westside WWT Backflow Prevention Improvement
Infrastructure
Post-Bid
Vancouver, WA 98660

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Royle Road S 19th to 460 LF N of S 15th
Infrastructure
Results
$2,350,000 est. value
Ridgefield, WA 98642

RFP Engineering - Select Design Engineering Services for the NE 182nd Ave and NE Risto Road Improvements
Infrastructure
Conception
$490,000 CJ est. value
Vancouver, WA 98660

Clark County I-5 Ramp Paving - ADA
Infrastructure
Design
Less than $958,000 est. value
Brush Prairie, WA

Repaint Pavement Markings in Parking Lots, FOVA
Infrastructure
Bidding
$30,000 CJ est. value
Vancouver, WA 98661

Asphalt Overlay and Court Paint Resurfacing of the Pickeball Court
Infrastructure
Post-Bid
Washougal, WA 98671

Water Meter Changeout
Infrastructure
Results
WA

Last Updated 07/26/2022 11:05 AM
Project Title

SR 503 SR 502 Intersection Improvements Project and Other Related Work

Physical Address View project details and contacts
City, State (County) Battle Ground, WA 98604   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $602,291 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 26, 2022, project was awarded to Rotschy, awarded amount is $602,290.97.** SCOPE OF WORK This Contract provides for the improvement of the SR 503 (NW and SW 10th Avenue) and SR 502 (W Main Street) intersection for provision of right turn lanes and additional left turn lanes. The Project includes clearing and grubbing, roadway excavation, storm sewer conveyance, treatment and detention, HMA paving, erosion control, curb and gutter, refuge island construction, sidewalk, traffic control, pavement marking, signing, traffic signal system, illumination and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The City Council shall proceed to award the contract to the lowest bidder and best bidder but may reject any or all bids if, in its opinion, good cause exists, therefore, to waive informalities in the bidding; and to accept the bid from the lowest responsible bidder. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Battle Ground Transportation Fund. The City of Battle Ground, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Information is available in an alternate language by request to cityclerk.infocityofbg.org. Informational copies of maps, plans, and specifications are on file for inspection in the Public Works Engineering office in Battle Ground, Washington. For project information, please contact Mark Herceg, PE, Public Works Director at (360) 342-5075.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents