Similar Projects
Marina Rock Wall and Stairway Repair
Infrastructure
Bidding
Sparks, NV 89434

Muller Parkway Improvement Project
Post-Bid
$9,400,000 est. value
NV

Concrete Culverts
Term Contract
Post-Bid
Nellis AFB, NV

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Lamb Boulevard Centennial Parkway
Infrastructure
Post-Bid
$9,500,000 to $11,000,000 est. value
North Las Vegas, NV 89115

Nellis Meadows: Park Improvements Irrigation Renovation and North Parking Lot Rehabilitation
Results
$4,966,543 to $5,227,941 est. value
Las Vegas, NV

FWRC Secondary Treatment Expansion Preloading
Results
$10,100,000 to $11,700,000 est. value
Las Vegas, NV

Mount Charleston Kyle Canyon Fire Station - Erosion Control
Results
$140,600 to $148,000 est. value
Mount Charleston, NV 89124

2021 Drainage and Roadway Improvements G Street and Shriver Boulevard
Results
$740,118 est. value
Sparks, NV

Centennial 2635 Zone Reservoir and 2745 Zone Pumping Station
New Construction
Results
$30,383,200 est. value
Las Vegas, NV

Marlette Lake Broodstock Facilities/Passage Improvement Project
Infrastructure
Results
$110,577 est. value
Reno, NV

Pinto Lane Streetscape Improvements Phase 1 - Shadow Lane To Martin Luther King Boulevard
Alteration
Results
$3,218,624 to $3,894,535 est. value
Las Vegas, NV

East Channel Construction Earl N. Jenkins Elementary School
Infrastructure
Results
$610,000 est. value
Las Vegas, NV 89142

Construct a Jack and Bore Pipe Connection to Existing Regional Facility Box Culvert and Associated Improvements
Infrastructure
Results
$620,000 to $745,000 est. value
Carson City, NV

Last Updated 10/08/2021 04:48 PM
Project Title

Rosewood Wash Drainage Improvement

Physical Address View project details and contacts
City, State (County) Reno, NV   (Washoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new storm drain infrastructure including PVC pipe, RCP pipe, manholes, catch basins, and appurtenances on Watt Street and Bonnie Briar Place between Plumb Lane and Lakeside Drive. Also included is replacement of sanitary sewer main, laterals, and installation of a sanitary sewer drop manhole as well as potable water main installation and gas infrastructure adjustments. Asphalt patching and portland cement concrete curb and gutter/pedestrian ramp replacement.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents