Similar Projects
New Bedford Hurricane Barrier Dewatering
Design
$1,000,000 to $5,000,000 est. value
New Bedford, MA

Install an Oil Water Separator
Post-Bid
$77,000 est. value
Taunton, MA

Drilling IDIQ In Massachusetts and Rhode Island
Post-Bid

Scheduled and Emergency Drainage Repairs and Improvements at various Locations
Results
Less than $685,975 est. value

Scheduled and Emergency Drainage Structure Reconstruction and Repairs at Various Locations
Results
Less than $637,000 est. value

Piles and Silt Curtain Installation - NB Middle Harbor
Results
Less than $130,000 est. value
New Bedford, MA

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Results
Less than $470,000 est. value

Road Materials - Aluminum, Concrete, Plastic Pipe
Results
Berkley, MA

Drilling IDIQ in Massachusetts and Rhode Island
Results

Bottom of CAD Cell No. 4 and North Terminal Expansion Project
Results
Less than $22,000,000 est. value
New Bedford, MA

Briggs Street Culvert Replacement
Results
$320,000 est. value
Dighton, MA 02715

Slope Stabilization, Greenwood Terrace 667-1
Results
Less than $42,530 est. value
Westport, MA

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
$680,575 est. value

DeMedeiros Grade Construction
Results
$40,000 est. value
New Bedford, MA 02745

Scheduled and Emergency Drainage Structure Repairs at Various Locations
Infrastructure
Results
$571,440 est. value

Last Updated 09/15/2021 11:30 AM
Project Title

Taunton River Bank Stabilization Project

Physical Address View project details and contacts
City, State (County) Raynham, MA   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Taunton River Bank Stabilization Project. The work consists of regrading and stabilizing a section of river bank adjacent to an existing sewer main.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents