Similar Projects
West Hill Sewer Separation Project (5C) - City of Muscatine
Infrastructure
Conception
$3,000,000 CJ est. value
Muscatine, IA 52761

Papoose Lift Station Force Main Redundant Line - City of Muscatine
Infrastructure
Conception
$900,000 CJ est. value
Muscatine, IA 52761

West Hill Area Sanitary and Storm Sewer Separation - Phase 6A and 6B
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Muscatine, IA 52761

New Wash Bay Facility
New Construction, Infrastructure
Post-Bid
$350,000 CJ est. value
Muscatine, IA 52761

Career Technical Education Building - Bid Package 6
Infrastructure, Alteration
Results
$200,000 est. value
Muscatine, IA 52761

Pipe Culverts
Infrastructure
Results
$250,000 to $500,000 est. value
Muscatine, IA

West Liberty Food / West Liberty
New Construction, Infrastructure - 200,000 SF
Pending Verification
$150,000,000 CJ est. value
West Liberty, IA 52776

Kent Pet Manufacturing Facility
New Construction, Infrastructure - 113,000 SF
Pending Verification
$80,000,000 CJ est. value
Muscatine, IA 52761

Fuller Park Erosion Control - City of Muscatine
Infrastructure
Conception
$300,000 CJ est. value
Muscatine, IA 52761

Construction of a NEW West Liberty Athletic Complex Mass Grading & Site Utilities
Infrastructure
Post-Bid
$500,000 CJ est. value
West Liberty, IA 52776

67th Avenue Sidewalk Improvements
Infrastructure
Results
$292,982 CJ est. value
Muscatine, IA 52761

Greenwood Cemetary Erosion Control - City of Muscatine
Infrastructure
Conception
$1,000,000 CJ est. value
Muscatine, IA 52761

Central Production Kitchen Project
New Construction, Infrastructure
Post-Bid
$850,000 CJ est. value
Muscatine, IA 52761

Fairport Fisheries - Pavalion Pavement and Parking Area (Rebid)
Infrastructure
Results
$24,972 CJ est. value
Muscatine, IA 52761

Heinz Sewer Reconstruction Project - City of Muscatine
Infrastructure
Conception
$725,000 CJ est. value
Muscatine, IA 52761

Last Updated 05/11/2023 03:35 PM
Project Title

Well 2 Improvements Phase 2 Pumphouse Improvements West Liberty

Physical Address View project details and contacts
City, State (County) West Liberty, IA 52776   (Muscatine County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $50,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Well #2 Improvements - Phase 2: Pumphouse Improvements at the location shown on the plans, including all labor, materials, and equipment necessary for demolition of exterior wall/window, installation of a new exterior double door with stoop, installation of wood-studded, gypsum board wall in three locations, two interiorman doors with locks, electrical work for outlets and new lighting, 74 SY of new driveway, removal and replacement of exterior fencing and all associated miscellaneous work including cleanup. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of five percent (5%) of the bid. The bid security should be made payable to the CITY OF WEST LIBERTY, IOWA. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approvedby the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of two (2) years after its completion and acceptance by the City Council. Liquidated damages in the amount of Two Hundred Dollars ($200.00) per consecutive calendar day will be assessed for each day that work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. The City Council reserves the right to reject any or all bids and to waive informalities or technicalities in any bid and to accept the bid which it deems to be in the best interest of the City.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents