Similar Projects
Gas Regulator Station #15 Replacement
Bidding
Warner Robins, GA

Propane Air Mix Plant Emergency Reserve
Post-Bid
Robins Afb, GA

Renovations To Wastewater Treatment Pond
Post-Bid
Forsyth, GA 31029

Relocate Fuel Farm
Results
Clarkesville, GA

SR 316 at Harbins Road Natural Gas Relocation
Results
Less than $948,610 est. value
Buford, GA

2020 Natural Gas Reliability Upgrades
Post-Bid
Dalton, GA 30721

Natural Gas Pipeline to Serve Belmont S/D
Results
Social Circle, GA

Steel Pipe 6 Foot Expansion - Provide and Deliver
Post-Bid
Cartersville, GA 30120

Natural Gas Pipeline to Serve the Oaks at Alcovy S/D
Results
Social Circle, GA

Metering Infrastructure Equipment And Meters
Post-Bid
Cartersville, GA

High Pressure Gas Main Extension Houston Lake Road
Results
Perry, GA 31069

Natural Gas Main Replacement
Post-Bid
Monroe, GA 30655

Fuel Farm Installation
Results
Less than $159,875 est. value
Woodbury, GA

Jet Fuel Truck Tank/Pump Assembly Removal, Refurbish, and Re-Installation
Post-Bid
Dalton, GA 30720

Gas Main Installation
Results
Commerce, GA 30529

Last Updated 02/25/2021 03:59 PM
Project Title

Thompson Mill Rd/Buford Hwy Natural Gas Relocation

Physical Address View project details and contacts
City, State (County) Buford, GA 30515   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the installation of approximately 600 linear feet of 8-inch steel gas main, 1,200 linear feet of 4-inch polyethylene gas main, 60 linear feet of 2-inch polyethylene gas main, untrenched installation, line valves, connections, services changeovers and related appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents