Similar Projects
Last Updated | 10/09/2023 11:38 AM |
Project Title | Add Third Lagoon Pump and Related Infrastructure - SW-01 - City of Foster City |
Physical Address | View project details and contacts |
City, State (County) | Foster City, CA 94404 (San Mateo County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected October 2024 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project provides for the removal of 2 non-functioning lagoon pump engines, impellers, shafts, and associated plumbing that were abandoned in place when the two current pumps were installed in 2001, so that a third functioning lagoon pump may be installed. Studies have shown that from 1974 to 2019 storms have become more severe and frequent due to climate change effects. When a significant storm event is happening, there are short durations when both lagoon pumps have been in operation and the lagoon level continued to rise. This project will add a third pump to the existing lagoon pump station which will provide the City with the redundancy to reduce the risk of flooding should a failure occur to either of the two existing pumps during a severe storm and high tide condition. The two existing lagoon pumps were replaced in 2001 and are 20 years old. Although the useful life is approximately 35 years, if one were to fail, it could take several weeks to repair. In recent years, there have been incidents in which debris, tires, etc. have caused a pump to fail. If this were to occur during a storm event, it would be catastrophic. Adding a third pump would allow for uninterrupted operation, redundancy, staggered replacement of the lagoon pumps, and provide maximum protection against the potential for flooding and property damage. This project is included in the City of Foster City's Preliminary 2023-2024 Budget Document. Per the owner, as of October 9, 2023, this project is still in pre-planning. A timeline for design and construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |