Similar Projects
LMI Solar Pilot Program
Alteration
Post-Bid
Dover, DE

Dagsboro RC Roof Mounted PV Solar Array
Alteration
Post-Bid
Dagsboro, DE 19939

Sussex County Family Court - New Generator Installation
Results
Georgetown, DE 19947

Electrical Repair Services
Term Contract
Results
New Castle, DE

Furnish and Deliver Fifty (50) Electric Operated Valve Actuators
Term Contract
Post-Bid
Milford, DE 19963

Electrical Contractor
Term Contract
Results
Dover, DE

Woodbridge Early Childhood Education Center Electrical Service Replacement
Alteration
Post-Bid
Greenwood, DE 19950

Master Electrician Service
Term Contract, Alteration
Results
Dover, DE

RFQ D/B - Dover SB MACC D/B Construct North Substation Transformer Stands, B614
Infrastructure
Post-Bid
$100,000 CJ est. value
Dover Air Force Base, DE 19902

PME-11 Switchgear for Stock
Alteration
Results
Dover, DE

Water Meter Replacements and Advanced Metering Infrastructure
Infrastructure
Post-Bid
$200,000 CJ est. value
New Castle, DE 19720

James T. Vaughn Correctional Center - East Building Generator Replacement
Alteration
Results
Smyrna, DE 19977

Garrison Oak Technical Park Substation Metal Clad Switchgear
Term Contract
Post-Bid
Dover, DE 19904

LED Security Lights with 7 Pin Photoelectric Eye
Alteration
Results
Dover, DE

Churchmans Complex Maintenance Base "D" Garage Electrical Upgrade
Renovation
Post-Bid
$3,562,207 CJ est. value
New Castle, DE 19720

Last Updated 11/22/2022 03:08 PM
Project Title

Riverwalk Railing Upgrades

Physical Address View project details and contacts
City, State (County) Milford, DE 19963   (Sussex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $301,504 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any questions about the Electrical Drawings must be submitted in writing by email to the project consultants Project Manager, Dwight Walters, PE, Senior Project Manager email: dwalters@verdantas.com by 5:00 pm on Wednesday 11/2/2022 to be included in the final Addendum #5 that will be issued on Tuesday 11/8/2022 by 1:30 pm. Riverwalk Railing Upgrades This bid includes all labor, materials, equipment, tools, and mobilization for removing existing Railings and installing Aluminum Railings with Stainless Steel Cables and Under-Rail Lighting. Any technical questions should be referred to Senior Consultant Matt Spong, RLA at mspong@duffnet.com. This project is subject to the State of Delaware's prevailing rate regulations pursuant to 29 Del.C. Ch. 69 6960. Bidders will not be subject to discrimination on the basis of race, creed, color, sex, sexual orientation, gender identity, or national origin in consideration of this award. Minority Business Enterprises, Disadvantaged Business Enterprises, Women-Owned Business Enterprises, and Veteran-Owned Business Enterprises will be afforded full opportunities to submit bids on this contract. The City reserves the right to reject any or all bids and to waive any informalities therein. The time of the opening of the bid may be extended from that described in the advertisement, with not less than two days' notice by certified delivery, facsimile machine, or other electronic means to those bidders' receiving plans. The Contractor shall comply with all requirements set forth in 29 Del.C. Ch. 69 6962. During the construction work, the Contractor and each Subcontractor shall implement an Employee Drug Testing Program in accordance with OMB Regulation 4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects (19 DE Admin. Code 4104). Large Public Works Projects is based upon the current threshold required for bidding Public Works as set by the Purchasing and Contracting Advisory Council.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents