Similar Projects
US 101/Chicken Coop Creek - Remove Fish Barrier
Infrastructure
Design
$2,472,000 CJ est. value
Cosmopolis, WA 98537

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Bidding
$210,000 est. value

Rainforest Trailhead Comfort Station Replacement
New Construction, Demolition, Infrastructure
Bidding
$250,000 to $500,000 est. value
Quinault, WA

Logging Road Resurfacing
Infrastructure
Post-Bid
Montesano, WA

East Pioneer Improvements Academy to Glenn
Infrastructure
Post-Bid
Montesano, WA 98563

Johnson Area Roads Overlay
Infrastructure
Results
$487,238 est. value
Aberdeen, WA 99111

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Montesano Street Paving Project
Infrastructure
Bidding
$367,000 CJ est. value
Westport, WA 98595

Greenwood Tie
Infrastructure
Post-Bid
WA

2021 Sidewalk Repair Project
Infrastructure
Results
$267,860 est. value
Aberdeen, WA

Ocean Beach Road Paving
Infrastructure
Bidding
$300,000 CJ est. value
Hoquiam, WA 98550

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Miller Junior High School Site Preparation for Covered Area
Infrastructure
Results
Aberdeen, WA 98520

Last Updated 07/28/2022 09:33 AM
Project Title

Northeast Neighborhood Development Phase One

Physical Address View project details and contacts
City, State (County) Aberdeen, WA 98520   (Grays Harbor County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $11,881,570 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to clearing and grubbing, excavation and embankment, water, sewer and stormwater utility installation, sidewalk construction, asphalt paving and all other work shown in project drawings. The engineer's estimate for this project is $6,500,000 to $7,500,000 including offsite improvements. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents