Similar Projects
Lumberyard Affordable Housing Development
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Aspen, CO 81611

2022 Asphalt Overlay Project
Infrastructure
Design
$500,000 CJ est. value
Aspen, CO 81611

RFP Engineering - Castle Creek Bridge Underpass Retaining Wall Assessment and Design
Infrastructure
Bidding
$60,000 CJ est. value
Aspen, CO 81611

Garmisch and Hallam Stormpipe and Watermain Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Aspen, CO 81611

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Horse Ranch Water Line
Infrastructure
Post-Bid
$150,000 est. value
Snowmass Village, CO 81615

Red Mountain Water System Improvements
Infrastructure
Results
Aspen, CO

As Needed Excavation Services
Term Contract
Results
Aspen, CO

Snowmass Water and Sanitation District Edgewood Water Line Connection
Infrastructure
Construction
$200,000 CJ est. value
Snowmass Village, CO 81615

Snowmass Water and Sanitation District Edgewood Water Line Connection
Infrastructure
Construction
$200,000 CJ est. value
Snowmass Village, CO 81615

New Terminal - Aspen-Pitkin County Airport
Addition, Infrastructure
Pending Verification
$121,800,000 CJ est. value
Aspen, CO 81611

Aspen Valley Hospital Phase 4
New Construction, Renovation, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Aspen, CO 81611

Snowmass Center Redevelopment
Demolition, Renovation, Infrastructure - 170,101 SF
Design
$5,000,000 CJ est. value
Snowmass Village, CO 81615

RFP Design of Water Treatment Facility Campus Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Aspen, CO 81611

North Star Parking Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Aspen, CO 81611

Last Updated 03/28/2023 08:33 AM
Project Title

Maroon Creek Penstock Lining Project

Physical Address View project details and contacts
City, State (County) Aspen, CO 81611   (Pitkin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Job Location Aspen Colorado Question Acceptance Deadline 02/14/2023 01:59 AM EST Questions are submitted online Yes There are two separate bid schedules for this project. The Bidder shall submit a bid for each schedule. The Bidder's proposal shall specify a unit bid price for each pay item in all bid schedules. Failure to include unit bid prices for each bid item in all bid schedules shall be cause for rejection of the Bidder's proposal. If a bidder does not bid on all schedules, his bids will be rejected and set aside. The schedules for this project are as follows: Base Bid Schedule: The work consists of the installation of 39" diameter ultraviolet-light cured-in-place pipe and 27" diameter ultraviolet-light cured-in-place pipe, the installation of 96" diameter manholes with man-access points and all necessary end seals and appurtenances, and the installation of 42" diameter steel pipe installed via open trench methods across Maroon Creek. Alternate Bid Schedule: The work consists of the installation of Weko-Seals in lieu of the ultraviolet-light cured-in-place pipe installation. The Alternate Bid Schedule will still include the fifteen 96" manholes with all necessary end seals and appurtenances, the installation of 42" diameter steel pipe, and all other work outlined in the Bid Proposal form. Each bid must be accompanied by Bid Security to include a bid bond or certified check made payable to the City of Aspen in the amount of 5% percent of the Bid. The Bid Security accompanying the three lowest responsive and responsible bids may be held until the Contract is awarded. The Bid Security accompanying the other proposals shall be returned promptly after the bid prices have been compared and evaluated. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 %

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents