Similar Projects
Non-Potable Reservoir Pump Station
Post-Bid
Brighton, CO 80601

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects
Renovation
Results
Durango, CO 81301

Lift Station Pump Replacement
Results
Denver, CO 80202

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

United Reservoir North Cell Pump Station
Post-Bid
Greenwood Village, CO

Ridgegate First Street Lift Station
Results
Lone Tree, CO

Chambers Reservoir Remediation Project Phase II
Post-Bid
Greenwood Village, CO 80111

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

Water System Improvements
Post-Bid
Romeo, CO 81148

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Pmaa, Pueblo Sfu - Replace Well Number 3
Results
Denver, CO 81105

Last Updated 08/27/2020 12:07 PM
Project Title

Proposals Ashcroft Draw Lift Station

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 services generally consist of preconstruction services that includes value engineering, constructability reviews, cost estimating, schedule development and management, and risk management planning. After collaboration with the Owner and Engineer (Plummer) on the design, the CMAR shall develop aGMP proposal.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents