Similar Projects
Grayson Parking Lot
New Construction - 1,200 SF
Conception
Pittsburgh, PA 15219

Chatham University - Shadyside Campus - Connect Campus Character to 5th Avenue
Renovation
Design
Pittsburgh, PA 15232

State Street Pedestrian Improvements
Infrastructure
Design
Hermitage, PA 16148

Womens Resource Center (WRC) Parking Lot 2022
Infrastructure
Bidding
$300,000 est. value
Scranton, PA

Church Street Resurface
Infrastructure
Bidding
$2,500,000 to $4,999,999 est. value
PA

College Avenue and Heister Street Sidewalk and Utility Upgrades
Renovation
Post-Bid
$662,219 est. value
University Park, PA 16802

Parking Lot Bituminous Repairs at the Expressway Travel Center (ETC) and Rochester Transportation Center (RTC)
Post-Bid
Aliquippa, PA 15001

Handicap Access & Ramp
Results
Stroudsburg, PA 18360

Hermitage Town Center Pedestrian Improvements
Results
Hermitage, PA 16148

Brent L Miller Jewelers
Infrastructure
Construction
Lancaster, PA 17601

PA 419 Main Street Resurface
Infrastructure
Bidding
$1,000,000 to $2,499,999 est. value

154-160 Main Street Parking Lot Project
Post-Bid
Dallas, PA 18612

Parking Lot Paving
Results
Berwick, PA 18603

2022 ADA Ramp Replacement Project
Infrastructure
Bidding
$200,000 est. value
Kulpsville, PA

Parking Lot Rehabilitation Contract Resurfacing Sealcoat Line Striping
Post-Bid
$200,000 est. value
PA

Last Updated 06/09/2022 03:40 AM
Project Title

East Fairmount Park Project

Physical Address View project details and contacts
City, State (County) State College, PA 16801   (Centre County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the removal of existing impervious surfaces and construction of a new pedestrian walking path, new curb and gutter, concrete pavers, ADA parking, installation of site furnishings and a small bio-retention area

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents