Similar Projects
Northern Quest Resort & Casino Hotel Wing
New Construction
Design
Spokane, WA 99224

The Outlet Collection - Mixed Use Redevelopment
New Construction - 46,350 SF
Conception
$66,000,000 est. value
Auburn, WA 98001

Boardmill Redevelopment Opportunity
New Construction - 44,000 SF
Post-Bid
$25,000,000 est. value
Bellingham, WA 98225

East Min Village Mixed-Use / 112th & Main
New Construction - 511,000 SF
Design
$106,280,000 est. value
Bellevue, WA 98004

Spokane Tribe Expansion Master Plan
New Construction, Addition
Conception
Airway Heights, WA 99001

Spokane Tribe Hotel
New Construction
Design
Airway Heights, WA 99001

Woodspring Suites Hotel
New Construction
Design
Olympia, WA 98506

Leavenworth Adventure Park
New Construction - 8,551 SF
Construction
$1,000,000 to $5,000,000 est. value
Leavenworth, WA 98826

2nd & Virginia Mixed Use Development
New Construction - 487,100 SF
Design
$10,000,000 CJ est. value
Seattle, WA 98101

Hotel Tower II Renovation, Fixtures Funiture and Equipment Procurement and Administration
Renovation
Bidding
$1,000,000 est. value
Shelton, WA 98584

4th Avenue Apartment Building With Hotel And Retail
New Construction, Infrastructure - 200,000 SF
Conception
Seattle, WA 98121

Reported 06/28/2022 04:30 PM
Project Title

Springhill Suites & Towneplace Suites by Marriott - Paine Field / Seattle - Everett

Physical Address View project details and contacts
City, State (County) Everett, WA 98204   (Snohomish County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected August 2023
Bids Due View project details and contacts
Estimated Value $43,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and new construction of a hospitality development in Everett, Washington. Conceptual plans call for the construction of a four-story above grade, 74-room hospitality development; and four-story above grade, 128-room hospitality development. As of June 27, 2022, this project is conceptual. A firm construction timeline has not been determined by the owner.

Details

Hotel/Motel, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents