Similar Projects
2021 Civil Works IDIQ
Design
$10,000,000 to $25,000,000 est. value
Hurlburt Field, FL

Provide Limerock, Limestone, and Asphalt Millings, Various Rock Sizes
Infrastructure
Bidding
Fort Walton Beach, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Eglin Construct Range Road 218 Bypass
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Eglin AFB, FL

Design and Construction of A New SR 8 (1-10) Interchange West of Crestview in Okaloosa County
Results
Crestview, FL 32536

Road Stabilization Project (Lime-Rock Placement and Compaction)
Results
Crestview, FL

Henderson Bach State Park - Entrance Improvements
Results
Destin, FL 32541

Resurfacing/Base Work/Drainage Improvements
Results
$20,707,385 est. value
FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Asphalt Paving Annual Bid
Term Contract, Infrastructure
Results
Fort Walton Beach, FL

Milling and Resurfacing
Infrastructure
Results
$5,422,250 est. value
FL

Asphalt Overlays for City Streets
Term Contract
Results
Crestview, FL

Resurfacing - SR 85 N Ferdon Blvd
Infrastructure
Results
$3,037,819 est. value
FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Silicone Joint Sealer
Infrastructure
Results

Reported 06/30/2022 11:52 AM
Project Title

Niceville College Boulevard Multi-use Path - County of Okaloosa

Physical Address View project details and contacts
City, State (County) Niceville, FL 32578   (Okaloosa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Obtained from a credible source, Awaiting verification, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Niceville, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. A more detailed scope is expected to be released on a future date. As of June 29, 2022, this project is in the conceptual phase. A design firm has not selected as of yet. Information regarding the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents