Similar Projects
Fire Station 11, Police Station and Fleet Maintenance Garage - Facility Improvements - Village of Northbrook
Renovation
Conception
$500,000 est. value
Northbrook, IL

Fire Station 2 - Village of Niles
New Construction, Demolition
Conception
$14,000,000 est. value
Niles, IL 60714

HQ Residences
New Construction, Demolition - 3,200 SF
Design
Mount Prospect, IL 60056

Police Headquarters Redesign
New Construction - 101,000 SF
Design
$35,000,000 est. value
Rosemont, IL

Hanover Park Fire Station #16
New Construction, Renovation, Infrastructure - 14,000 SF
Sub-Bidding
$4,327,904 CJ est. value
Hanover Park, IL 60133

Fire Station 32 and Police Station
Renovation, Addition - 62,786 SF
Post-Bid
$200,000 est. value
Streamwood, IL 60107

Westchester Village Hall and Police Department Tenant Improvement and Relocation
Renovation, Alteration
Post-Bid
$130,000 est. value
Westchester, IL 60154

Police Range
Renovation
Results
Lincolnwood, IL

South Fire Station Bunk Room, Locker Room and Restroom
Renovation
Results
Oak Park, IL 60304

Fire Station #61 Interior Renovations
Renovation
Construction
$1,410,841 CJ est. value
Des Plaines, IL 60016

Fire Station 35 Remodel
Renovation
Pending Verification
Park Ridge, IL

Fire Station 36 Remodel
Renovation
Pending Verification
Park Ridge, IL

Fire Station 2 - Restroom Upgrades - City of Evanston
Renovation
Conception
$500,000 CJ est. value
Evanston, IL 60202

Police Station Addition - City of Des Plaines
Addition, Demolition, Renovation, Infrastructure - 22,000 SF
Design
$20,900,000 CJ est. value
Des Plaines, IL 60016

Tinley Park Police Department Firing Range Renovation
Renovation
Post-Bid
$3,500,000 est. value
Tinley Park, IL 60477

Last Updated 01/26/2023 10:07 AM
Project Title

Fire Station 42 - CP(N)-70 - Village of Wheeling

Physical Address View project details and contacts
City, State (County) Wheeling, IL 60090   (Cook County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 24, 2022, a construction manager has been selected. A firm timeline for bidding and start of construction has not been provided. A detailed scope of work has not been determined. This project is included in the Village of Wheeling FY 2022-2026's CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents