Similar Projects
Cosgrove Subdivision
New Construction
Conception
Mobile, AL 36608

The Point
New Construction
Conception
Saraland, AL 36571

Gulf Village and Oaklawn Homes Make Ready and General Repair Services
Renovation
Post-Bid
Mobile, Prichard, AL 36610

Sixteen Exterior Residential Homes
New Construction
Post-Bid
Mount Vernon, AL

Renovation of Property at 355 North Ann Street
Renovation, Demolition - 5,750 SF
Results
$793,963 est. value
Mobile, AL 36603

Tara Place Subdivision
New Construction
Pending Verification
Saraland, AL

Hackbarth Subdivision
New Construction
Pending Verification
Mobile, AL

Bear Run Subdivision
New Construction
Conception
Saraland, AL 36571

MHA Accessibility Improvements - Gulf Village
Renovation
Post-Bid
Mobile, AL

DP Estates
New Construction
Pending Verification
Mobile, AL

Make Ready and Repair Services for Oaklawn and Gulf Village Homes
Renovation
Post-Bid
Mobile, Prichard, AL 36610

McDuffie Residence
New Construction - 2,342 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Mobile, AL 36608

20 Interior / Exterior Residential Homes
Renovation
Post-Bid
$500,000 est. value
Mount Vernon, AL

Creole Corner Subdivision
New Construction
Pending Verification
Mobile, AL

Mckinley Sparks Subdivision
New Construction
Pending Verification
Mobile, AL

Reported 05/18/2022 12:32 PM
Project Title

Critical Repair Roof Replacement - 2355 Crestwood Circle

Physical Address View project details and contacts
City, State (County) Mobile, AL 36617   (Mobile County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding, Sitework Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a residential development in Mobile, Alabama. Completed plans call for the renovation of a residential development. If you have any questions, you can call Ginny Kirby at 251-208-6297. Location: 2355 Crestwood Circle Areas that are found to be spaced decked shall be covered with 1/2" exterior grade sheathing material after removing the existing decking. It is the contractors responsibility to ensure the framing and structure will support the additional load. Remove existing roofing materials down to bare decking. Check all roof trusses/rafters and repair/replace as needed to ensure that new roof structure is flat and smooth without rises or depressions in roof system. Replace all rotten, broken, un-even, weak, or deteriorated decking framing, fascia and etc. Any exposed repaired or replace wood should be protected from the elements, painted to match existing color or white. Replaced/repaired decking shall be level and ready to accept felt and shingles. Check all roof trusses for strength and stability before re-shingling house. Remove all unused elements, vents, etc., that are not operational and close them below roof level. Re-flash all valleys, vents, roof openings, and chimneys. Install new boots around all roof penetrations. Haul away debris immediately. Use a magnetic sweep around the perimeter of house and rake away any other debris. Cover entire roof decking with self-adhered roofing underlayment then install 15# asphalt impregnated felt underlayment. Prepare roof decking to accept a ridge vent. Re-roof with a 30year dimensional class A fiberglass asphalt shingle. (Owners choice of color) Shingles must be 1 st quality still in the wrapper. Seconds will not be accepted. Install drip rail around perimeter of house. Shingles shall have 1/2" to 1 1/2" overhang. Install roof over ridge vent with-in 2ft of end of ridge (end to end) or wind turbines, (minimum of two) as appropriate. New roof shall be structurally sound and leak free. Contractor shall warrant the roof to be completely leak free for one year

Details

Single-Family Homes, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents