Similar Projects
Rehabilitation of Water Storage Facilities
Infrastructure
Bidding
$1,100,000 est. value
Lynnfield, MA 01940

Beebe and Doeskin Tank Cleaning
Post-Bid
Framingham, MA

Supply and Installation of an Ice Bridge at the Indian Head Heights Water Storage Tank Site
Post-Bid
Less than $40,000 est. value
Framingham, MA

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Champion City Recovery - Rail Tarping Station Replacement
New Construction
Pending Verification
Brockton, MA 02301

Water Tanks Maintenance and Asset Management
Term Contract
Post-Bid
Canton, MA

Z--CACO Marconi Water Tower Repair and Painting
Results
$250,000 to $500,000 est. value
Wellfleet, MA

Seekonk High School Domestic Hot Water Tank
Infrastructure
Post-Bid
$80,000 est. value
Seekonk, MA 02771

World-Wide Water Storage Tank Remediation
Term Contract
Results

New Biofilter for EQ/Sludge Tank
Infrastructure
Post-Bid
Wareham, MA 02571

CACO - Temporary Potable Water Storage
Results
Wellfleet, MA

Water Storage Facility - Smith Neck Road Elevated Tank
Infrastructure
Post-Bid
$1,500,000 est. value
Dartmouth, MA

Allen Street Standpipe
Term Contract
Results
Less than $300,000 est. value
Dartmouth, MA

Town Hill Water Storage Tank Replacement Project
Infrastructure
Post-Bid
$3,600,000 est. value
Ipswich, MA 01938

Reported 03/04/2022 12:00 AM
Project Title

Bourne Hill and West Wareham Tank Rehabilitations

Physical Address View project details and contacts
City, State (County) Wareham, MA   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 02/17/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of rehabilitation of the Bourne Hill and West Wareham steel water standpipes in Wareham, Massachusetts, which includes full coating system replacement on the interior and exterior surfaces of the tanks and other appurtenant work on tanks. Surface preparation requires full containment on the exterior, or if approved by the Owner, the use of a self-contained robotic steel grit abrasive machine with an isolated containment system or other approved containment systems. Bourne Hill rehabilitation is scheduled to take place in fall 2022 and West Wareham rehabilitation in spring of 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents