Similar Projects
Bray Hill
New Construction
Conception
Rosemount, MN 55068

Vergus Estates South
New Construction, Infrastructure
Conception
$2,700,000 CJ est. value
Prior Lake, MN 55372

BohLand Luxury Homes
New Construction
Design
Wayzata, MN 55391

Rush Hollow
New Construction
Design
Maple Grove, MN 55369

New Single-Family Residential Home
New Construction - 3,000 SF
Post-Bid
Saint Cloud, MN 56304

Redevelopment of the Former Hamm's Brewery Complex
New Construction, Demolition
Post-Bid
Saint Paul, MN

Single Family Home
New Construction
Results
Saint Paul, MN 55118

Mixed-Use Woodland Development
New Construction
Results
Duluth, MN 55803

Pine Bend Estates
New Construction - 31,752 SF
Construction
Inver Grove Heights, MN 55077

Radisson Hills
New Construction, Infrastructure
Construction
$18,000,000 CJ est. value
Blaine, MN 55449

Amber Fields
New Construction, Infrastructure
Pending Verification
$740,500,000 CJ est. value
Rosemount, MN 55068

Bruestle Subdivision
New Construction
Pending Verification
Rosemount, MN

Industries West Plat 4
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Waite Park, MN 56387

Avienda - Phase 1
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Chanhassen, MN 55317

Habitat For Humanity Single Family Home Improvements
Renovation
Post-Bid
Cottage Grove, MN 55016

Last Updated 06/30/2023 08:05 AM
Project Title

Spire Valley Residence Basement Buildout

Physical Address View project details and contacts
City, State (County) Remer, MN 56672   (Cass County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids
Project Status All Bids Rejected, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $104,544 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work will be completed under one prime contract. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Remodel of existing open basement to provide a new bedroom, bathroom, and storage area. Revise existing stair to meet residential code as noted in drawings Provide new lighting and power to code as outlined in drawings Provide new supply air / mechanical to code as outlined in drawings Final completion of the work will be within 130 calendar days from and including the date of the Final Notification to Proceed. No questions will be answered at this time. Questions must be asked at the follow up meeting or submitted by email. All questions must be submitted no later than: May 30th 2023 The State is not obliged to answer questions submitted after the question due date and time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents