Similar Projects
Boiler Replacement
Bidding
Chesnee, SC 29323

Mechanical Systems Water Treatment Services
Bidding
Charleston, SC 29424

Mechanical Package (HVAC) for Dean Hall
Post-Bid
Moncks Corner, SC 29461

900 Building Boiler Replacement
Post-Bid
$50,000 to $100,000 est. value
Graniteville, SC 29829

Hydraulic Water Chiller
Results
Charleston, SC 29404

J--Cynosure Laser & Chiller / Preventative Maintenance Service
Results
Charleston, SC 29403

10 X 10 Walk in Cooler, Installation, Demo of Existing Cooler
Bidding
Clemson, SC

Rebuild Centrifuge No.1
Post-Bid
West Columbia, SC

J--Water Treatment Boiler and Chiller Plant SDVOSB or VOSB Set-Aside _ Dependent Upon Responses Received
Results
Columbia, SC

Steam Fired Domestic Water Heater
Bidding
Columbia, SC

Remove and Install New Gas Water Heaters
Term Contract
Post-Bid
West Columbia, SC 29169

J-- Boiler Plant Semi and Annual Maintenance
Results
Charleston, SC 29401

J045--Boiler Life Expectancy and Damage Assessment Inspection
Bidding
Columbia, SC 29209

Adjutant General Water Heater Replacement
Post-Bid
$63,000 to $73,000 est. value
Columbia, SC

CF Haynsworth Federal Building Chiller Replacement
Results
$250,000 to $500,000 est. value
Greenville, SC 29601

Reported 07/31/2020 12:00 AM
Project Title

Cooling Tower Replacement for TFF Site Preparation Project

Physical Address View project details and contacts
City, State (County) Aiken, SC 29808   (Aiken County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cooling Towers Requirements: - The Cooling Tower shall have three water pumps. Each cooling water pump shall deliver water at a minimum of 1120 gpm. - The new Cooling Tower Supply piping shall connect to the existing 10" pipe - The new Cooling Tower Return piping shall connect to the existing 10" pipe - The new Cooling Tower shall have a Domestic Water piping connection for make-up water - The new Cooling Tower Chemical Make-up piping shall connect to the existing 1” pipe - The cooling towers piping shall be installed and tested in accordance with ASME B31.3

Details

Division 01 - General Requirements, Site Construction Performance Requirements, Site Preparation Performance Requirements.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Cooling Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents