Similar Projects
Tertiary Filtration System Expansion - C66401416 - City of Petaluma
Addition, Demolition, Renovation, Infrastructure
Conception
$16,100,000 CJ est. value
Petaluma, CA 94954

SCIHP Medical Office Building
New Construction, Infrastructure - 70,000 SF
Conception
$40,600,000 CJ est. value
Santa Rosa, CA 95403

Clearwater at Windsor
New Construction, Infrastructure - 26,750 SF
Design
$74,000,000 CJ est. value
Windsor, CA 95492

Northpoint Commerce Center
New Construction, Infrastructure - 114,884 SF
Design
$12,500,000 CJ est. value
Santa Rosa, CA 95407

Cultural and Environmental MATOC
Term Contract
Post-Bid

Cultural and Environmental Resources Services (MATOC) (IDIQ)
Term Contract
Post-Bid

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Copeland Creek Bank Restoration
Infrastructure
Results
Rohnert Park, CA 94928

Fountaingrove Apartments
New Construction, Infrastructure
Construction
$90,000,000 CJ est. value
Santa Rosa, CA 95403

Shiloh Crossing
New Construction, Infrastructure - 8,000 SF
Construction
$67,000,000 CJ est. value
Windsor, CA 95492

Lago Fresca Apartments
New Construction, Infrastructure - 72,535 SF
Pending Verification
$20,000,000 CJ est. value
Santa Rosa, CA 95405

Hilton Hotel / Santa Rosa
New Construction, Infrastructure - 44,166 SF
Pending Verification
$13,300,000 CJ est. value
Santa Rosa, CA 95403

Pleasant Oak Park Improvements - Town of Windsor
Infrastructure
Conception
$2,000,000 CJ est. value
Windsor, CA 95492

Mckinley Elementary School New Modular Classrooms
New Construction, Infrastructure - 1,200 SF
Design
$2,440,000 CJ est. value
Petaluma, CA 94952

Install Rock Slope Protection and Roadway Excavation
Infrastructure
Post-Bid
$1,410,000 est. value
CA

Last Updated 06/19/2023 03:32 AM
Project Title

Dry Creek Ecosystem Restoration Project Phase II

Physical Address View project details and contacts
City, State (County) Healdsburg, CA 95448   (Sonoma County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,675,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

DRY CREEK ECOSYSTEM RESTORATION PROJECT - PHASE II PROJECT DESCRIPTION: The Project is located along Dry Creek, just dow nstream of Warm Springs Dam near Healdsburg, Sonoma County, California and is part of a larger Dry Creek ecosystem restoration effort by both USACE and Sonoma Water to restore over six miles of stream and floodplain habitat. While much of this ecosystem restoration has previously been completed by Sonoma Water and USACE, this project is the second of three phases of construction that w ill restore approximately 2.6 miles (47 acres) of stream and floodplain restoration during 2021-2024. This requirement is a HUBZone Small Business Set-Aside. It w ill be issued as an Invitation for Bids (IFB) w hich w ill result in the aw ard of a single Firm Fixed Price (FFP) contract. The North American Industry Classification System (NAICS) Code applicable to this acquisition is: 237990 The Small Business Size Standard is: $39.5 Million The magnitude of the requirement is: Betw een $5,000,000 and $10,000,000. An organized site visit is scheduled for 21 March 2023 at 10:00 AM PST. Each contractor is limited to TWO (2) personnel for the site visit. Please see Section 00 21 00 Clause 52.236-27 for further details and instructions. Questions relating to this solicitation and technical inquiries will be submitted via email to the assigned contract specialist, Dennis Neal, via email at james.neal@usace.army.mil. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents