Similar Projects
Mixed-Use Development
New Construction - 204,000 SF
Conception
$10,000,000 CJ est. value
Alexandria, VA 22314

Fairfax Peak Indoor Ski Resort
New Construction - 500,000 SF
Conception
$10,000,000 CJ est. value
Lorton, VA

Cavalier Inn Project
New Construction
Design
Charlottesville, VA 22904

Holiday Inn Rosslyn Redevelopment
New Construction, Build-Out, Demolition - 774,100 SF
Design
$10,000,000 CJ est. value
Arlington, VA 22209

Hotel and Conference Center
New Construction - 25,000 SF
Post-Bid
Charlottesville, VA 22903

Marker 20 - Building 485
Renovation - 9,646 SF
Post-Bid
Herndon, VA 20170

DLA Fitness Center Renovation
Renovation
Results
$5,000,000 to $10,000,000 est. value
Richmond, VA 23237

New River Trail State Park Renovation of Foster Falls Hotel
Renovation - 12,000 SF
Results
Foster, VA 24360

Watkins Centre Apartments
New Construction - 8,000 SF
Construction
$30,300,000 est. value
Midlothian, VA 24104

Main Street Apartment Building
New Construction - 4,000 SF
Construction
$9,443,796 est. value
Richmond, VA 23223

Potomac Yard Landbay C-East
New Construction - 519,001 SF
Pending Verification
Arlington, VA

The Zone at Greenbrier Mall
New Construction - 183,000 SF
Pending Verification
$80,000,000 est. value
Chesapeake, VA 23320

Northfax West Mixed Use
New Construction
Conception
Fairfax, VA 22030

Little City Commons
New Construction - 516,400 SF
Design
$10,000,000 CJ est. value
Falls Church, VA

Brambleton Building R Expansion
Addition - 12,610 SF
Post-Bid
Brambleton, VA 20148

Last Updated 01/10/2022 01:55 PM
Project Title

Embassy Suites Hotel at Cavalier Oceanfront Resort

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA 23451   (Virginia Beach City County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Hotel/Motel
Contracting Method
Project Status Construction Commenced July 2021, Construction Completion Expected December 2022
Bids Due View project details and contacts
Estimated Value $43,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, New Construction, 1 Hotel/Motel, 12 Stories Above Grade, 142,037 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Hospitality Furniture.
Division 13 - Special Construction, Commissioning of Special Construction, Commissioning of Swimming Pools, Swimming Pools, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents