Similar Projects
FY 2021-2022 Crack Seal Program
Infrastructure
Bidding
$300,000 est. value
Lake Havasu City, AZ 86403

FY21-22 CQS Fog Seal Program
Infrastructure
Bidding
$340,000 est. value
Lake Havasu City, AZ 86403

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Terminal Access Road Reconstruction and Drainage Improvements
Results
$1,500,000 to $200,000 est. value
Bullhead City, AZ 86429

System Enhancement (Safety Improvements)
Results
Bullhead City, AZ 86429

Horsethief Basin Roads Maintenance - Prescott National Forest
Term Contract
Post-Bid
Prescott, AZ 86301

Safety Improvements
Results
Less than $640,000 est. value
Kingman, AZ 86411

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $9,500,000 est. value
Kingman, AZ 86401

Hot and Cold Mix
Term Contract
Results
Kingman, AZ 86401

FY 2020-2021 Crack Seal Program
Results
Less than $300,000 est. value
Lake Havasu City, AZ

FY 20-21 CQS Fog Seal Program
Results
Less than $550,000 est. value
Lake Havasu City, AZ 86403

Construct SB Right Turn Land on SR 95
Results
Bullhead City, AZ 86429

Fort Mohave Penetrate and Chip Seal
Results
$149,749 est. value
Kingman, AZ

Apache Road Improvements South Phase
Results
Kingman, AZ

Last Updated 10/07/2021 10:50 AM
Project Title

McCulloch Boulevard Pavement Rehabilation Project

Physical Address View project details and contacts
City, State (County) Lake Havasu City, AZ 86403   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,055,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of roto-milling McCulloch Blvd., from Smoketree Ave. to Acoma Blvd., full width and placing 3 inches of compacted asphalt concrete pavement full width. It also involves full depth removal of said road a prescribed distance shown in the project plans and specs at the Pima Wash crossing and bump-out removal at the intersection of McCulloch Blvd. and Mulberry Ave.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents