Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Bidding
Fresno, Sequoia National Park, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Bidding
Fresno, Sequoia National Park, CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure - 195,000 SF
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

Construction Pine Flat Road Repair Project
Infrastructure
Post-Bid
CA

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Paving Repairs and Ramps at FHFB
Term Contract
Post-Bid
Richmond, CA

Last Updated 02/18/2022 11:33 AM
Project Title

Downtown De La Vina St Safe Crosswalks and Buffered Bike Lanes and the Eastside Community Paseos Project

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA 93101   (Santa Barbara County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove one vehicle lane and add a buffered bike lane on De La Vina Street between Carrillo Street and Haley Street. Curb extensions, high visibility signs, and pavement markings will be installed at six intersections along De La Vina Street. Along Haley Street from De La Vina to Chapala Streets, parking will be removed to accommodate a Class IV protected bike lane.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents