Similar Projects
Last Updated | 05/31/2021 05:09 AM |
Project Title | Guardrail Maintenance and Repair |
Physical Address | View project details and contacts |
City, State (County) | (Henderson, Polk, Transylvania Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 Sp Emergency Repair Mobilization 15 Ea 2 Sp Routine Repair Mobilization 25 Ea 3 Sp Impact Attenuator, Type Tl-3 2 Ea 4 Sp Impact Attenuator, Type Tl-2 1 Ea 5 862 Steel Beam Guardrail 2,000 Lf 6 862 Steel Beam Guardrail, Double Faced 200 Lf 7 862 Triple Corrugated Steel Beam Guardrail 100 Lf 8 862 Steel Beam Guardrail Terminal End Sections 5 Ea 9 862 20” Tubular Triple Corrugated Steel Beam Guardrail 50 Lf 10 862 W-Tr Steel Beam Guardrail Transition Sections 20 Ea 11 862 25' Clear Span Guardrail Sections 2 Ea 12 862 Extra Length Guardrail Posts (8' Steel) 200 Ea 13 862 Extra Length Guardrail Posts (10' Steel) 10 Ea 14 862 Extra Length Guardrail Posts (12' Steel) 10 Ea 15 862 Additional Guardrail Posts 50 Ea 16 Sp Guardrail Anchor Units, Type Iii Modified 4 Ea 17 Sp Guardrail Anchor Units, Type Buried In Cut 4 Ea 18 862 Guardrail End Units, Type At-1 10 Ea 19 862 Guardrail End Units, Type Cat-1 10 Ea 20 Sp Guardrail Anchor Units, Type Iii 8 Ea 21 Sp Guardrail End Units, Type Tl-3 20 Ea 22 Sp Guardrail End Units, Type Tl-2 10 Ea 23 Sp Guardrail End Units, Type Median Tl-3 2 Ea 24 Sp Guardrail End Units, Type 77 5 Ea 25 Sp Guardrail End Units, Type 83 2 Ea 26 864 Remove And Reset Existing Guardrail 1,000 Lf 27 864 Remove And Reset Existing Guiderail 100 Lf 28 863 Remove Existing Guardrail 1,000 Lf 29 863 Remove Existing Guiderail 50 Lf 30 863 Cable Guiderail 1,000 Lf 31 863 Double Faced Guiderail 300 Lf 32 865 Additional Guiderail Posts 59 Ea 33 865 Cable Guiderail Anchor Units 2 Ea 34 866 Woven Wire Fence, 47" Fabric 500 Lf 35 866 4" Timber Fence Posts, 7'-6" Long 25 Ea 36 866 5" Timber Fence Posts, 8'-0" Long 25 Ea 37 866 Additional Barbed Wire 100 Lf 38 Sp Steel Beam Guardrail, Rail 2,000 Lf 39 Sp Steel Beam Guardrail, Shop Curved, Rail 250 Lf 40 Sp Steel Beam Guardrail, Block 100 Ea 41 Sp Steel Beam Guardrail, Typical End Shoe 4 Ea 42 Sp Triple Corrugated Steel Beam Guardrail, End Shoe 4 Ea 43 Sp Steel Beam Guardrail, Buffered End Section 5 Ea 44 Sp Triple Corrugated Steel Beam Guardrail, Rail 100 Lf 45 Sp Additional Guardrail Posts, Weakened 10 Ea 46 Sp Steel Beam Guardrail, 2'-1" Height Transition 500 Lf 47 Sp Additional Delineators 150 Ea 48 Sp Guardrail Post Box Culvert Anchor Unit 10 Ea 49 Sp Painted Galvanized Steel Beam Guardrail 100 Lf 50 Sp Painted Galvanized Triple Corrugated Steel Beam Guardrail 25 Lf 51 Sp Painted Galvanized Steel Beam Guardrail, Shop Curved 50 Lf 52 Sp Painted Galvanized Guardrail End Units, Type Tl-3 2 Ea 53 Sp Painted Galvanized Guardrail End Units, Type At-1 2 Ea 54 Sp Painted Galvanized Additional Guardrail Posts 10 Ea 55 Sp Painted Galvanized W-Tr Steel Beam Guardrail Transition Sections 4 Ea 56 Sp Painted Galvanized Steel Beam Guardrail, Rail 100 Lf 57 Sp Painted Galvanized Steel Beam Guardrail, Shop Curved, Rail 50 Lf 58 Sp Painted Galvanized Steel Beam Guardrail, Buffered End Section 2 Ea 59 Sp Painted Galvanized Guardrail Anchor Units, Type Iii 2 Ea 60 Sp Cable Guiderail, Cable 50 Lf 61 Sp Cable Guiderail, Cable Splice 10 Ea 62 Sp Cable Guiderail, Turnbuckle 6 Ea 63 Sp Cable Guiderail, Hook Bolt 60 Ea 64 Sp Cable Guiderail, Re-Tension 25 Ea 65 Sp Two Lane Work Zone Traffic Control 20 Ea 66 Sp Multi-Lane Work Zone Traffic Control 20 Ea |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |