Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Construct A Pedestrian Bridge Across The Cumberland River Connecting East Germantown To The East Bank North - 19DS0129 - Metropolitan Government of Nashville & Davidson County
Alteration
Conception
$22,139,000 est. value
Nashville, TN

Storyville Gardens Phase 1
New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Nashville, TN 37219

FY22 USACE Nashville District Design-Build and Design-Bid-Build Multiple Award Task Order Contract (MATOC)
Term Contract
Design
Nashville, TN 37219

Taxiway R3 Apron Expansion, North Development and Airside Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Nashville, TN 37209

Taxiway R3 Apron Expansion, North Development and Airside Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Nashville, TN 37209

Guardrail Construction Maintenance and Repairs
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Nashville, TN 37219

FY22 USACE Nashville District Environmental Services MATOC
Term Contract
Sub-Bidding
$5,000,000 CJ est. value
Nashville, TN 37219

Annual Rehabilitation FY2017 Dry Creek
Infrastructure
Post-Bid
$5,500,000 est. value
Nashville, TN

Construction Management Services - Phase II of Fair Park at the Fairgrounds Nashville
Renovation
Post-Bid
Nashville, TN

Gibson Creek Equalization Facility
New Construction
Results
Nashville, TN 37115

8th Avenue South and Moss Rose Drive Water Main
Infrastructure
Results
Nashville, TN 37216

Ariza Bellevue
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Nashville, TN 37221

Dickerson Pike Apartments
New Construction, Infrastructure - 10,000 SF
Pending Verification
$46,000,000 CJ est. value
Nashville, TN 37207

Pie Town Multi-Residential
New Construction, Infrastructure
Conception
$33,000,000 CJ est. value
Nashville, TN 37203

Last Updated 08/11/2022 08:03 AM
Project Title

JPP Seven Points Campground Sewer Rehab Project

Physical Address View project details and contacts
City, State (County) Nashville, TN 37076   (Davidson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $512,120 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Aug 08, 2022 Contract Award Number: W912P522C0005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: N5AGWWWTJWN5 Contractor Awarded Name: Lee's Excavation LLC Contractor Awarded Address: Trenton, KY 42286-9781 USA Base and All Options Value (Total Contract Value): $512120.00 PROJECT DESCRIPTION: The Nashville District, U.S. Army Corps of Engineers, is issuing an Invitation for Bid (IFB) for a firm fixed-price construction contract. The work includes construction of the Seven Points Sanitary Sewer network which includes minor clearing and grubbing, trench excavation, placement of HDPE force main and to include assembly and construction of all pertinent sewerline components, connection to the existing sewerline network, flowable fill for abandon sanitary sewer pipes and abandon septic tank, construction of wet well tank and pump vault, pump installation and all pertinent components, some potential pavement replacement, granular backfill placement and compaction, in-situ material backfilling, seeding and mulching, and any other incidental related work including survey of final pipe network and environmental protection. Contractor mobilization shall not be permitted until the Seven Points Day Use area is closed for the season, 06 September 2022. Contractor shall be completed with all construction, clean-up, and demobilized from the day use premises prior to 31 March 2023. The Contractor will have to coordinate with Nashville Electric Service and Nashville Water Service as applicable. If the construction of the project is delayed and passes 31 March 2023, the Contactor shall be required to provide 3 portable toilets and at least one ADA approved portable toilet and close the comfort station until the final connections are made, or the Contractor can elect to pump the existing septic tank until the final connections are made to the proposed septic tank. DISCLOSURE OF THE MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: Between $500,000 and $1,000,000. NAICS CODE AND SBA SIZE STANDARD: Y1NZ and 237110 - Water and Sewer Line and Related Structures Construction Size Standard $39.5M. TYPE OF SET-ASIDE: 100% Total Small Business Set-aside Site is schedule for 02 June 2022 at 0930 AM Central Time Location: 1900 Stewarts Ferry Pike Hermitage, TN 37076 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work includes construction of the Seven Points Sanitary Sewer network which includes minor clearing and grubbing, trench excavation, placement of HDPE force main and to include assembly and construction of all pertinent sewerline components, connection to the existing sewerline network, flowable fill for abandon sanitary sewer pipes and abandon septic tank, construction of wet well tank and pump vault, pump installation and all pertinent components. some potential pavement replacement, granular backlitl placement and compaction, in-situ material backtilling, seeding and mulching. and any other incidental related work including survey of final pipe network and environmental protection. It is anticipated that the Contractor will encounter mostly soil during trenching and excavation operations, there will be minor rock encountered during excavation operations.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents