Similar Projects
East-West BRT Intersection
Post-Bid
Milwaukee, WI

Milwaukee Mitchell International Airport T & M Metal Fabrication & Asphalt Paving
Term Contract
Post-Bid
Milwaukee, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Resurfacing
Renovation
Results
Glendale, Milwaukee, WI

Kwik Trip Store #422
New Construction, Addition - 1,544 SF
Construction
$850,000 est. value
Oak Creek, WI 53154

2021 Time And Material Zoological Gardens
Term Contract
Post-Bid
Milwaukee, WI

2021 Green Infrastructure Upgrades Bid Package 2
Results
Milwaukee, WI 53204

Asphalt High Impact Paving- Group 3
Post-Bid
Milwaukee, WI

Sidewalk High Impact Paving Work
Results
Milwaukee, WI

Remodeling and Repairs 2820 N 22Nd Street
Renovation
Post-Bid
Milwaukee, WI

2021 Street Improvement Program
Results
Bayside, WI 53217

Asphalt High Impact Paving- Group 4
Post-Bid
Milwaukee, WI

2021 Sidewalk Improvement Program
Results
$75,000 est. value
Milwaukee, WI

2021 Road Improvement Program
Post-Bid
Saint Francis, WI

Underwood Creek Parkway Road Replacement
Results
Wauwatosa, WI 53222

Last Updated 07/22/2022 10:37 AM
Project Title

Vliet Service Station Renovation

Physical Address View project details and contacts
City, State (County) Wauwatosa, WI 53213   (Milwaukee County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

plans call for renovating a gas station. As of July 22, 2022, this project is pending design review approval. Information regarding the selection of a general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents