Last Updated 02/16/2021 10:09 AM
Project Title

Rehabilitation and Widening of Chardonnay Trace

Physical Address View project details and contacts
City, State (County) Braselton, GA 30517 (Barrow, Jackson Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to, 0.2 miles of widening, reconstruction and drainage improvements to Chardonnay Trace from SR53 to 1,050 +/- FT from center line of SR 53. The purpose is to add a left turn lane (resulting in dual lefts) and reconstruct the road. Milling, inlay, and re-striping on SR53 will be required. Signal modification will be performed by Georgia Department of Transportation (GDOT) crews. Time of completion for all work associated with this project shall be one hundred eighty (180) days.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents