Similar Projects
West Loop Phase II - FP067 - City of Davenport
Infrastructure, Alteration
Conception
$722,938 est. value
Davenport, IA 52801

New Youth Justice & Rehabilitation Center
New Construction, Infrastructure - 64,000 SF
Bidding
Davenport, IA 52807

Duck Creek Golf Cart Paths 2022
Infrastructure
Bidding
Davenport, IA 52803

All Inclusive Swing at Vander Veer Park
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Davenport, IA 52803

Supplemental Community Water Source - Well at Genesis East
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Davenport, IA 52803

Sump Pump Abatement Project
Term Contract, Infrastructure
Post-Bid
$20,000 CJ est. value
Davenport, IA 52801

Auxiliary Site Clearing
Demolition, Alteration
Results
Davenport, IA 52802

Revetment
Infrastructure
Results
IA

New Workforce Housing
New Construction
Construction
Davenport, IA 52801

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Kimberly Road Car Wash
New Construction, Infrastructure - 2,176 SF
Pending Verification
$500,000 CJ est. value
Bettendorf, IA 52722

Goose Creek Restroom Installation
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Davenport, IA 52806

Emeis Bunkers Renovation Phase 3
Infrastructure
Post-Bid
$50,000 CJ est. value
Davenport, IA 52804

Bicentennial Park Emergency Access
Infrastructure
Results
$110,000 CJ est. value
Riverdale, IA 52722

Our Lady of Lourdes Church and St. John Vianney New School and Church
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Bettendorf, IA 52722

Last Updated 08/12/2022 01:07 PM
Project Title

Devil's Bluff Addition (Devil's Glen Townhomes)

Physical Address View project details and contacts
City, State (County) Bettendorf, IA 52722   (Scott County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $47,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 114 apartments and 12 townhomes. As of August 12, 2022, this project is pending site development plan and final plat approval. Information regarding the selection of a general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, Apartments, 126 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents