Similar Projects
Webster Avenue Drainage Project, Phase II
Infrastructure
Bidding
New Rochelle, NY 10805

Provide for the Construction of a Bulkhead
Post-Bid
Port Chester, NY 10573

Construction of a Bulkhead 2
Post-Bid
Port Chester, NY 10573

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Purchase and Deliver Drain Covers
Results
Yonkers, NY 10701

Proposed U.S. Route 9 Culvert Replacement Phase 2
Infrastructure
Post-Bid
Sleepy Hollow, NY

Chappaqua Train Station - Tertia Brook Culvert Improvements
Results
Chappaqua, NY 10514

2021 Fairway Drainage Project
Infrastructure
Post-Bid
Rye, NY 10580

Replacement of Pennsylvania Avenue Over Troublesome Brook
Results
Yonkers, NY 10701

Young Avenue Field Sinkhole Remediation
Infrastructure
Post-Bid
New Rochelle, NY 10803

Webster Avenue Drainage Improvements - Washington Avenue to Lockwood Avenue
Results
New Rochelle, NY 10801

Various Paving and Drainage Improvements South County Trailway
Results
$3,800,000 to $4,000,000 est. value
Elmsford, NY

Phase V Construction of Open Space Recreation Area - 178 Warburton at the Ridgeway Infrastructure Improvements
Results
Yonkers, NY 10701

Glover Field Culvert Replacement Project
Results
Pelham, Pelham Manor, NY 10803

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Reported 10/22/2021 12:00 AM
Project Title

Dows Lane Culvert Replacement Project

Physical Address View project details and contacts
City, State (County) Irvington, NY 10533   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 10/08/21
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all labor, materials and equipment necessary to remove and replace the existing culvert with a five foot corrugated polyethylene pipe. The work also includes concrete headwalls, rip rap stabilization, the restoration of a stone wall and a concrete wall, drainage manhole, concrete sidewalks, curbs, milling and paving, all modifications.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents