Similar Projects
Durand - Mondovi Construction / Resurface
Infrastructure
Conception
$3,000,000 CJ est. value
Alma, WI 54610

Durand - Mondovi Construction / Resurface
Infrastructure
Conception
$3,000,000 CJ est. value
Alma, WI 54610

Prairie Du Chien - Ferryville Const / Mill and Overlay / RSRF
Infrastructure
Design
$13,000,000 CJ est. value
Nelson, WI 54756

Prairie Du Chien - Ferryville Const / Mill and Overlay / RSRF
Infrastructure
Design
$13,000,000 CJ est. value
Nelson, WI 54756

Lock and Dam 4 Lower Guide Wall End Cell Project
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Alma, WI 54610

North Eau Claire Street
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Mondovi, WI 54755

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Durand - Mondovi, Holmes Creek Bridge, B-06-0387
New Construction, Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Wabasha - Durand Construction / Resurface
Infrastructure
Design
$2,000,000 CJ est. value
Nelson, WI 54756

Chip-Sealing
Infrastructure
Post-Bid
$35,000 CJ est. value
Fountain City, WI 54629

Mondovi - Eau Claire, USH 10 to STH 85
Infrastructure
Results

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Prairie Moon Road - CTH O, Br. Rose Valley Creek Bridge, B-06-0197
New Construction, Infrastructure
Results
WI

Last Updated 03/07/2023 05:41 PM
Project Title

Schmidt Road Rip Rap Project

Physical Address View project details and contacts
City, State (County) Waumandee, WI 54622   (Buffalo County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Rip Rap - Fimian Road Bridge Abutments, Hauling and Rock Placement Questions - Contact Bruce Auseth, Chairman 715- 495-2434

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents