Similar Projects
Edmundson Park Improvements
Infrastructure
Bidding
$602,800 CJ est. value
Oskaloosa, IA 52577

Construction of the Water Tower
Renovation
Sub-Bidding
$887,170 CJ est. value
Bondurant, IA 50035

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Results
$1,991,800 CJ est. value
Des Moines, IA 50317

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Post-Bid
$390,000 CJ est. value
Carroll, IA 51401

VA District - Phase 1 Improvements
Infrastructure
Results
$3,346,000 CJ est. value
Knoxville, IA 50138

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

Chemical Building
New Construction, Infrastructure
Results
$1,707,000 CJ est. value
Eagle Grove, IA 50533

Time and Material (NTE), Commercial Plumbing Contracting
Term Contract
Post-Bid
Ames, IA 50010

Skywalk Heat Pump Replacement
Infrastructure
Results
$24,820 CJ est. value
Sioux City, IA 51101

East Sac County High School
Infrastructure
Post-Bid
$267,000 CJ est. value
Lake View, IA 51450

Last Updated 04/25/2023 03:34 PM
Project Title

RFQ Contractor - Dallas County Admin Building- BP-23.02 Plumbing

Physical Address View project details and contacts
City, State (County) Adel, IA 50003   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

BP 23.02 Plumbing - This package includes supply and install of all Plumbing systems. Scope of work subject to change as design develops. Turner Construction will receive Statements of Qualification (also referred to as Preapproval Forms herein) for construction of Dallas County Administration Building in Adel, Iowa. The project consists of site improvements, construction of a new 54,566 square foot two story building, and demolition of existing buildings. Any/all questions are to be submitted electronically via Building Connected website. Questions can be submitted at any time but must be submitted no later than 12:00 PM on April 19, 2023. Responses to questions received will be published as a clarification document and posted to Building Connected by 5:00 PM on April 21, 2023.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents